My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10181241_2210 N. SPINNAKER - Plan (2)
PBA
>
Building
>
Plans
>
S
>
Spinnaker St
>
2210 N Spinnaker St
>
10181241_2210 N. SPINNAKER - Plan (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2021 11:54:08 PM
Creation date
10/25/2020 9:52:26 PM
Metadata
Fields
Template:
Plan
Permit Number
10181241
Full Address
2210 N Spinnaker St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
connectivity <br />2. Place the groundirig clip onto the trame, making <br />sure that the screw straddles the drilled hole. See <br />Figure 3. Using a No. 2 cross-recessed screwdriver, <br />thread the screw into the hole until the head is flush <br />with the base and the base is flush with the frame, <br />then tighten the screw with another 1/1 to 1,2 turn. <br />Recommended torque is given in Figure 4. <br />SCREW TIGHTENING TORQUESCREW SIZE <br />(Nrn [in.-lbs]) <br />10-32 2.3,0.51-0.2 [19+4.4/-1.7] <br />8-32 1.7+0.5/-0.2 [15+4.4/-1.7] <br />Figure 4 <br />3. Forthe grounding clip with the 8-32 or 10-32 screw <br />and hex nut or nut with lock washer, thread the nut <br />onto the end of the screw, then usihg a 3/8-in. <br />wrench for the 8-32 screw or 1 3/32-in: wrench for <br />the 10-32 screw, tighten the nut. See Figure 3. <br />4. Insert the wire into the wire slot. Press dowh on <br />both ends of the wire (the wire slot will cause the <br />wire to form a slight curve). See Figure 3. <br />5. Manually, or using channel lock pliers, push the <br />slider over the base until it covers the base. This will <br />terminate the wire. See Figure 3. <br />4. REMOVAL <br />Insert the tip of a flat-head screwdriver into the <br />removal slot, and rotate the screwdriver so that the <br />slider moves away from the base until the screw head <br />is exposed. Remove the Wire. <br />To remove the grounding clip with the thread-cutting <br />screw from the frame, loosen the screw. To remove <br />the grounding clip with the 8-32 or 10-32 screw and <br />hex nut or nut with lock washer from the frame, use a <br />3/8-in. or 1 3/32-in. wrench, respectively, to remove the <br />nut, then loosen the screw. <br />Rev G <br />408-10160 <br />5. RtPLACEIVItN 1 AND REPAIR <br />The grounding clip can be re-used up to 5 times after <br />proper removals (the 8-32 or 10-32 screw and hex nut <br />or nutwith lock washer can be re-used; however, the <br />10-32 thread-cutting screw must be replaced). Do not <br />re-use the 10-32 thread-cutting screw after removing <br />the grounding clip from the frame. The grounding clip <br />is not repairable. Discard and replace any defective or <br />damaged grounding clips. <br />Order replacement assemblies through your <br />representative, or call 1-800-526-5142, or send a <br />facsimile of your purchase order to 717-986-7605, or <br />write to: <br />CUSTOMER SERVICE (038-035) <br />TYCO ELECTRONICS CORPORATION <br />PO BOX 3608 <br />HARRISBURG PA 17105-3608 <br />6. REVISION SUMMARY <br />Revisions to this instructioh sheet include: <br />° Removed SoIKIip* from name of product <br />• Replaced Keps nut with nut with lock washer <br />(Keps is a trademark) <br />2 of-2 <br />f.
The URL can be used to link to this page
Your browser does not support the video tag.