Laserfiche WebLink
SolarMount Unirac Code-Complian:t Installation Manual :1:UNIRAC <br />[3.3] Installing SolarMount with bottom mounting clips <br />This section covers SolarMount rack assembly where the installer has elected to usebottom;mounting clamps to secure modules to <br />the rails. It details the procedure for flush mounting SolarMount systems to a pitched roof. <br />/1- <br />pv modules {face down} \44\ <br />Mounl rail <br />Fooling boll 3101 <br />Bottom mounting clip <br />Wigl,re-21.-Rani, r,na rR i·r•*"p-nents <br />Table 14. Wrenches and torque <br />Wrench Recommended <br />sue torque (ft-jbs) <br />74 " hardware 716- 10 <br />%" hardware %6" 30 <br />Note:Torque spedvcations do not appbt to lag bolt <br />Connections. <br />Staihless steel hardware can seize up, a process <br />rrdlerl grdli-ng Tn signijierrntly r¥'/17/rp itt <br />likelihood, (1) apply lubricant to bolts, preferably <br />an anti-seize lubricant, available at auto parts <br />.Ii·i#·6., (2) Al„„1.11„„,lve,in· L'sh„ it,i„.li,lhah,„, <br />and (3) avoid spinning on nuts at high speed. <br />See Installation Supplement 910, Galling and Its <br />Prevention, atwww. unii·ac.com. <br />PIle <br />21 <br />.