Laserfiche WebLink
SOL PH 0 TOVOLT PRO JECT <br />THE STATE OF CALIFORNIA <br />PROPOSED PROJECT IS IN THE COUNTY OF LOS ANGELES <br />U //« <br />SCOPE OF WORK: <br />SCOPE INCLUDES THE INSTALLATION OF A SOLAR PHOTOVOLTAIC <br />PROJECT CONSISTING OF SOLAR ELECTRIC PANELS MOUNTED ON A <br />ROOFTOP, CONNECTED WITH A DC/AC INVERTER AND ALL RELATED <br />ELECTRICAL COMPONENTS AS REQUIRED BY APPLICABLE LOCAL CODES <br />AND THE LOCAL ELECTRICAL UTILITY COMPANY. THE EXACT LOCAnON <br />OF THIS RESIDENTIAL PROPERTY CAN BE OBTAINED FROM THESE PLANS <br />THE ELECTRICAL SYSTEM SHALL BE INTERCONNECTED AND OPERATED <br />IN PARALLEL WITH THE UTILITY AND APPLICABLE CODES. <br />,4»ER L // <br />LiLI: <br />Z <br />P3 <br />ONI 91996 ¥JN <br />'01N <br />l, <br />l- <br />29t <br />-6C <br />% <br />AR AIC APPROVED E <br />PLANNING DIVISION - <br />THE CHAPMAN RESIDENCE MASTER I.D. 201 4 1+190 0. <br />G.P ;p 1.-Zone Rl <br />- <br />01 r <br />PROJECT INFORMATION:SHEET MEI DATEQ*L & <br />VICINITY MAP <br />NAME OF OWNER:JUSTIN CHAPMAN pv-1+0 TR>,1.-'Jt'l''21'.C*-' CIT DA- <br />PV-2.0 SITE PLAN & DETA]LS <br />PROJECT ADDRESS:2534 N. SPURGEON STREET <br />SANTA ANA, CALIFORNIA 92706 ... -- PL,6,1(11:62&44@ECTiON REOUREE <br />FINAL <br />ASSESSOR PARCEL NUMBER: #3964-3310 DATA SHELIS <br />AVERAGE HIGH TEMPERATURE:NAME (714). <br />„ RECORD LOW TEMPERATURE: = <br />.L -1 <br />i RETAIN PLAN E- 4 ' 21 :7- ·· 70 <br />BELOVt: <br />I /9 O INTER C.:. -3 ONLY <br />O NO EX".ZE -3'-<,UERATI- <br />24 I <br />S »- <br />D k <br />SCREE:WNG REQUI 2%2.,ip <br />SUBMT LANDSCAP ter,; te Ly ' 6' - &491 <br />1 !E- 0 <br />NDITIONS: S': ..., r. 2 Z% I '- rn= 1 <br />1 903 1 <br />& 1315 6- 1 0 0.6 291 to <br />EQUIPMENT SUMMARY: - --<=al| t..2 2 229l O .·64 0 .49 ·. 1.11 WTittlJ8/1... 2 ,0SOLAR MODULE:SUN EDISON SILVANTIS MEMC 250W Pr <br />___ W· $ A ·m and op <br />NUMBER OF MODULES 4 0 +C <br />SYSTEM SIZE:1,000 WATTS 8- < Q 0 4r ·-0 ' <-' 2¥4.-LOV <br />SOLAR RACKING:UNRIAC SOLARMOUNT <br />MODULE TILT:4/12 PITCH, 18.5 T]LT <br />SOLAR INVERTER(S):ENPHASE: MICRO-INVERTER M215-60-2LL-S22 0 1 1' <br />NUMBER OF INVERTERS: 4 - *M ePROPOSED <br />ROOFING ATTACHMENT:QUICKMOUNT COMPOSITION 12" X 12' CLASSIC LOCATION FOR 0 01 (4) SOLAR w <br />GROUNDING METHOD:ILSCO GROUNDING LUGS (GBL-4DBT)PANELS <br />- UL 2703 USTED (NEC 690) 1 1 I <br />- UL 467 LISTED, CS.A CERTIFIED (NEC 250) | <br />FED i <br />E PLA¢!S <br />P <br />U <br />J*09/ 8 <br />ry-6.0 <br />9 9*4.0 <br />MAY i 4 Luti <br />Jity of Santa Ana <br />4/ <br />L0 <br />3an,0 <br />A <br />9-* 1 T Linit ty of Car,: r <br />.visic:13 r. 0 <br />CONNECRONS TO MAIN ELECTRICAL SERVICE ARE 120/240VAC <br />SINGLE-PHASE FROW THE LOCAL POWER UTILITY. <br />ISSUED CONSTRUCTION PERMIT SHALL INCLUDE ALL NECESSARY <br />LABOR FOR INSTALLATION OF SOLAR PV ARRAY, REQUIRED <br />ELECTRICAL EQUIPMENT AND INTERCONNECTION TO THE EXISTING <br />ELECTRICAL SERVICE. PERTAINING TO. BUT NOT LIMITED BY THE <br />FOLL™NG: <br />V <br />0 <br />GARAGENERAL NOTES: <br />1. THIS SOLAR PHOTOVOLTAIC SYSTEM SHALL BE INSTALLED IN <br />EX!STING ACCORDANCE WITH THE REQUIREMENTS SPECIFIED IN ARTICLE THE CHAPMAN RESIDENCE 1 <br />690 OF THE 2013 CBC AND ALL APPUCABLE BUILDING CODES.DRIVEWAY <br />2. ACCESS TO THE ELECTRICAL WIRE SHALL BE RESTRICTED TOQUALIFIED PERSONNEL ONLY AS REQUIRED BY ARTICLE 690 OF <- <br />THE 2013 CBC. <br />Capi00 El _. <br />1 Date Esue , -- <br />u M <br />5 2 01 5 <br />- ROOFING ATTACHMENTS <br />- MECHANICAL SOLAR RACKING <br />- SOLAR ELECTRIC PANELS <br />- JUNCTION BOX(ES) AND/OR SOLAR COMBINER BOX(ES) <br />- ELECTRICAL CONDUIT BODIES <br />- AC DISCONNECT(S) <br />- DC DISCONNECT(S) <br />- DC/AC POWER INVERTER(S) <br />SOLAR PRODUCTION METER(S) <br />- ELECTRICAL CONDUCTORS <br />- REQUIRED WARNING LABELS <br />- EQUIPMENT BONDING CONDUCTOR(S) <br />- GROUNDING OF SOLAR ELECTRICAL SYSTEM <br />- UTILITY AND/OR SERVICE INTERCONNECTION <br />3. ALL LOCATIONS ARE APPROXIMATE AND SHALL REQUIRE FIELD <br />SITE VERIFICATION BY THE SOLAR CONTRACTOR. <br />4. CONDUCTOR SIZES AND CALCULATED CONDUIT VALUES ARE Z <br />NOMINAL AND SHALL BE VERIFIED BY THE SOLAR CONTRACTOR. <br />5. SEE ELECTRICAL CALCULATIONS AND THE ONE-LINE DIAGRAM <br />FOR THE CONDUCTOR SIZES AND CONDUIT SIZES PER THE <br />REQUIREMENTS OF THE CBC 2013. <br />6. PHOTOVOLTAIC MODULES SHALL NOT BE INSTALLED OVER ANY <br />ATTIC. PLUMBING, OR MECHANICAL VENT. <br />7. ELECTRICAL SHALL RUN THROUGH CONDUIT ON TOP OF THE ROOF <br />AND EXIT THE ROOF UNDER THE EAVES. TERMINATION SHALL BE <br />ABOVE THE DISCONNECT. <br />8. LAGS SHALL NOT BE PLACED ON THE EAVES OVERHANG. <br />150' --->-Itf <br />2 -44*Zz CALL Fi <br />PROPOSED SITE PLAN <br />SCALE: 3/32 = 1'-0» <br />ZERO ENERGY CONTRACTING <br />_ _ CLASS 'B' CONTRACTORUCENSE NUMBER; 953417 <br />EXPIRATION DATE: 10/3 /2014 <br />CONTRACTOR: <br />SIGNATURE:________----------- <br />SHEET I.win' PeQG -,/8/2014 71 10 >1' '. ./1 <br />920 <br />l E .-lge <br />000