Laserfiche WebLink
Installation Instructions with Compression Bracket <br />f.%;AgifgALAdj.;Ltiff.:LAJW095:3. <br />0 %P .1 41: far.2,':3.7<31174 Ji?.31.C¥ 'D---A=Me33 €¢#f;159 -7 pit <br />* t#'fil<44'> <br />1"%4:2% <br />r: I <br />*. .124>11 <br />4:-C. i:€.1894:,2.-52;769,/. <br />,C€.%· <br />*...¢ <br />en S • <br />4 <br />1. Locate the rafters and snap horizontal and vertical lines to mark the <br />installation position for each flashing. <br />2. Drill a pilot hole (1/4"diameter) for the lag bolt. Backfll with sealant. <br />4. Line up pilot hole with flashing hole. <br />3. Insert the flashing so the top part is under the next row of shingles <br />and pushed far enough up slope to prevent water infiltration through <br />vertical joint in shingles. <br />5. Insert the lag bolt through the EPDM washer, the top compression <br />component (Comp Slide 4"Bracket pictured) and the gasketed hole in <br />the flashing and into the rafter. <br />1..+- - ,/6. Torque: The range is between 100-140 torque inch-pounds depending <br />on the type of wood and time of year. The visual indicator for proper <br />torque is when the EPDM on the underside of the bonded washer <br />begins to push out the sides as the washer compresses. If using an <br />5 impact wrench to install the fasteners be careful not to over torque the <br />fastener. You may need to stop and use a ratchet to finish the install. <br />877-859-3947 Committed to the Support of Renewable Energy © Ecolasten Solar- All content protected under copyright. All rights reserved. 04/8/14 <br />r <br />1 1 W <br />-- <br />-[Se©-[Pm-t <br />--