Laserfiche WebLink
Loyd W. Martin Solar Structures Engineering <br />2510 W. 237th St. #206 Torrance, CA 90505 Tel:1.310.464.1804 <br />Email: loydwmartin@gmail.com www.loydwmartin.com <br />Check attachment of Support to Existing Structure for Wind Uplift - Cont'd <br />Tributary Area to Each Solar Mount = 4 ft. x 2.75 ft. = 11 sq. ft. ( Max ) <br />Calculate Uplift at each support:/JOF ESS/oNX <br />Pnet = A 1<zt 1 P net30 Eq'n 30.5-1 ASCE 7-10 <br />A = 1.35 Wind Speed 130 mph Exposure C \*\ Exp. 3-31-15 j */) <br />Kzt = 1.0 V«2111/49 <br />1=1.0 <br />Pnet30 = -46.5 Psf <br />Pnet = 1.35 x 1.0 x 1.0 x (-46.5 psf) = -62.8 psf <br />Nominal (Unfactored) Uplift at each support = 62.8 psf x11 sq. ft. = 691 lbs <br />Note: Section 2.4.1 of ASCE 7- 10, Basic Load Combinations for Allowable Stress <br />Design. Note: Applicable Load Combination #5 (D + 0.6W) <br />Design (Factored) Uplift at each support = 0.6 x 691 lbs = 414 lbs <br />Load per lag screw = 414 lbs /2= 207 lbs <br />Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below <br />according to the 2012 NDS. <br />W'=WxCdxCt Table 10.3.1 2012 NDS <br />where: <br />V = 266 lbs / in. of embedment per Table 11.2a <br />per Table 2.3.2 of 2012 NDS <br />per Table 10.3.4 of 2012 NDS <br />V' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 - 1,064 lbs>207 lbs OK <br />Use Support connected to 2x Min. Roof Member <br />w/ (2) 5/16" x 3.5" lag screws per connection minimum. <br />2014-870 Smart Energy Tammy Doan Residence <br />Sht # 4 of 6 <br />Date: May 30, 2014