Laserfiche WebLink
ORANGE COUNTY FIRE AUTHORIT <br />Plan Submittal Criteria <br />COMMERCIAL projects, MULTIFAMILY RESIDENTIAL <br />and RESIDENTIAL TRACT developments <br />CITY OF SANTA ANA <br />Plani iii ig ai id Buildii ig Agency <br />— gam <br />;FOkNCE <br />INSTRUCTIONS: <br />• Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place. <br />• Answer questions 1 through 10 read and initial items 11 and 12, then complete and sign the certification s hRBster ID: <br />• If you answer: - "YES' to any part of questions 1 through 10, submit the type of plan indicated in italics to ffAe: <br />• In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations. <br />• Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions rel, <br />requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine. CA 92602. <br />Address Suite city <br />I0 5 ie�f� ) I It ` -� <br />Project Sco Business Description <br />r <br />1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways, <br />curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within <br />300 feet of an active or proposed oil well? Fire Master Plan (PR145) <br />2. n aProperty is adjacent to a wildland area or non -irrigated native vegetation? <br />Fire Afaster Plan (PR145); aFuel Xfodijication Plan tna-valso he required. (PRI20, PR124) <br />3, J U Located in or < 100' from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300' from <br />an oil/gas seep, or < 1000' from a landfill? Afethane Work Plan. (PR170) <br />4. Q�Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving <br />private fire hydrant/sprinkler/standpipe systems? underground Plan. (PR470, PR475) <br />5. O Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000 <br />sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable <br />to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless <br />classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration <br />or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouseslrowhouses <br />where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories <br />with 17+ people? High-rise structure (55+feet to highest occupied floor level)? .lrchitecturalPlan (PR200-PR285) <br />6. V CJ Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card, <br />V button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan <br />depending on the occupancy and type of device installed (PR 200 PR280, PR420-PR425, PR500-PR520) <br />7. V Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment; <br />V industrial/commercial refrigeration systems, compressed gasses; tanks for cryogenic or flammable/combustible <br />liquids; vapor recovery, smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium <br />ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations? <br />Special Equipment Plan (PR315, PR340-PR382) <br />8. Q Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft <br />maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if <br />H occupancy); Special Equipment Plans may be necessant (PR315-PR360, PR232-PR240) <br />9. n� Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12' (6' for high -hazard <br />`•� commodities, plastic, rubber, foam, etc.)? High -piled Storage Plait (PR330) <br />10.0 fj� Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a <br />'.�i commercial cooking hood? Hood & Duct Extinguishing System, notjust the hood mechanical plan. (PR335) <br />Initial each of the following two items indicating that you have read and understand the statement: <br />11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is <br />required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed <br />Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications. <br />12. /,/I Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located <br />ti in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327— <br />nrtials the building department will determine specific requirements. <br />I certify under penalty of perjury under the laws of the State of California that the abov r <br />Print Name <br />Signature �-- �—� <br />x � <br />v <br />Phone Number 1 / <br />�ti <br />71 <br />Building Department: If you have verified that all of the �uestions have been answered accurately as "NA", and the project does not otherwise require OCFA <br />ofri review spnkler or alarm plans*, then you may accept this .signed form as a written release that OCFA review is not required. Shorild you still require that the <br />appbcant have plans approved by OCFA, please initial here or attach an 0CF1 referral form and have the applicant submit the form along with the <br />appropriate plans and fees for OCFA review. 10-08-14 EE <br />