Laserfiche WebLink
Dong Engineering Inc. <br />2 ADU'S <br />512-514 HUYLARS LN, SANTA ANA, CA 92703 <br />Job#: 250195 <br />Date: 5/21/2025 <br />PLAN: 1 <br />CODE: CBC 2022 <br />Shear Wall (Y-Y Direction) <br />Line Story Section Span Wind Seismic Added V (lb)H L v Type <br />###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf) <br />1 1 1Y 56.5 106 91 8 8.75 344 B <br />2 1 1Y 56.5 106 91 8 8.75 344 B <br />Shear wall design concept is chosen as Individual full-height wall segment (Sec. 4.3.2.1 ) and Force-Transfer Around <br />Openings (FTAO) (Sec. 4.3.2.2 ). <br />For mix-type, chosen concept is determined by more critical design result. <br />v(plf) = V/L <br />Line shear V = Maximum(V1;V2) <br />SUMMARY SHEAR WALL <br />V1 = Wind*Span/2 + Added Vwind <br />V2 = Seismic*Span/2 + Added Vseismic <br />15 of 26