My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD ZONE - 512 & 514 N Huylars Ln - Plan
PBA
>
Building
>
ProjectDox
>
H
>
Huylars Ln
>
512 N Huylars Ln
>
FLOOD ZONE - 512 & 514 N Huylars Ln - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 5:00:14 AM
Creation date
2/12/2026 5:00:05 AM
Metadata
Fields
Template:
Plan
Permit Number
101124558
101124559
Full Address
512 N Huylars Ln
514 N Huylars Ln
Street Number
514
Street Direction
N
Street Name
Huylars
Street Suffix
Ln
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />Planning and Building Agency <br />518 Huylars Ln <br />Santa Aka CA 92703 <br />At a minimum, the floor slab shall be reinforced with # 4 reinforcing bars placed 18 inchcHpploved <br />center throughout the entire slab and shall be placed in the center of a 5-inch slab fQRN. �ci`dsSUANCE <br />tend to dry out prior to placing the floor slab, therefore, prior to placing concrete, the sub -grade soils <br />shall be remoisturized to 90 % of optimum moisture to a depth of 12 inches. <br />Master ID: <br />Date: <br />Driveways and Parking Areas <br />Asphalt paving shall be a minimum of 2 inches of/z inch maximum aggregate asphalt over 4 inches of <br />3/4 inch crushed rock, gravel or miscellaneous base. The sub grade shall be compacted to 95% <br />minimum and the aggregate base shall be compacted to 90% of maximum density minimum. <br />Concrete driveways and parking areas shall be constructed a minimum of 4 inches thick with <br />construction joints at a maximum of 10 feet. Minimum reinforcement shall consist of #3 reinforcing <br />bars crossing at 24 inches on center and placed in the center of the slab. The driveway shall be <br />constructed over a minimum of 3 inches of crushed rock, gravel or miscellaneous base. Prior to <br />placing concrete, the driveway sub -grade shall be saturated to 100% of optimum moisture to a depth of <br />12 inches. <br />Utility Trenches <br />The development of the site will obviously require utility trenches. Although these trenches are limited <br />in scope, they present significant problems when they are not properly dug and properly backfilled. <br />On site material may be used for utility line backfill. The backfill shall be compacted to 90% of max <br />density. <br />Fill placement and compaction requirements <br />Material for engineered fill should be select free of organic material, debris, ad other deleterious sub- <br />stances, and should not contain fragments greater than 3 inches in maximum dimension. On -site exca- <br />vated soils that meet these requirements may be used to backfill the excavated Residential Building <br />area. <br />All fill should be placed in 6 inch thick maximum lifts, watered or air dried as necessary to achieve <br />near optimum moisture conditions, and then compacted in place to a maximum relative compaction of <br />90%. The laboratory maximum dry density and optimum moisture content for each change in soil type <br />should be determined in accordance with Test Method ASTM D 1557. A representative of the project <br />consultant should be present on -site during grading operations to verify proper placement and compac- <br />tion of all fill, as well as to verify compliance with the other geotechnical recommendations presented <br />herein. <br />G <br />
The URL can be used to link to this page
Your browser does not support the video tag.