My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
411 & 413 E 20th St - Plan
PBA
>
Building
>
ProjectDox
>
T
>
Twentieth St
>
413 E Twentieth St
>
411 & 413 E 20th St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 5:00:10 AM
Creation date
2/12/2026 5:00:05 AM
Metadata
Fields
Template:
Plan
Permit Number
101125143
Full Address
413 E Twentieth St
Street Number
413
Street Direction
E
Street Name
Twentieth
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Limited Asbestos Survey Report <br />411 E 20th Street <br />Santa Ana, CA 92706 <br /> <br />12631 Imperial Hwy Suite A225. Santa Fe Springs, CA 90670 <br />www.terraeng.com <br /> <br /> <br />V. General Recommendations and Notes <br /> <br /> This survey was limited to accessible materials within the defined project work areas. Concealed <br />spaces or materials outside the renovation scope were not inspected. No inaccessible suspect <br />materials were noted during the survey. If concealed or hidden suspect materials are discovered <br />during renovation, work must stop until the material is sampled and analyzed by a qualified <br />inspector. <br /> <br /> Written by, <br /> <br /> <br /> <br /> ____ <br /> Israel Monsalvo, <br /> DOSH CAC #04-3551 <br /> CDPH Lead I/A #LRC-00001220 <br /> <br />VI. Confidentiality and Limitations <br /> <br /> All material quantities are approximate and provided solely for regulatory compliance <br />documentation; they are not intended for bidding or contractual purposes. This document also is <br />not intended as a contract manual; work methods and sequence, coordination of participants, <br />applicable codes, engineering controls, required submittals and notifications should in all cases <br />be addressed in a separate and independent bidding and contract document. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.