My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10181692_2026 E. 20TH - Plan (2)
PBA
>
Building
>
Plans
>
T
>
Twentieth St
>
2026 E Twentieth St
>
10181692_2026 E. 20TH - Plan (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2021 5:27:33 PM
Creation date
10/25/2020 9:53:20 PM
Metadata
Fields
Template:
Plan
Permit Number
10181692
Full Address
2026 E Twentieth St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SOLARMOUNT <br />Top Mounting UniRac Grounding Clips and WEEBLugs - 225.6 <br />UGC- 1 <br />b Nib _< <br />To-3 9T . mounting . <br />„1 clamps I. <br />Module <br />G, 4-4 uge-1 '44 <br />Intertek i i <br />Conforms to ,.. -·•---ah• ----------t2M <br />UL Standard 467 777*7972342 <br />Figure 26. Slide UGC-1 grounding <br />clip into top mounting slot OfraiL <br />Torque moddes in place on top of <br />clip. Nibs wilrpenetrate rail anod- <br />Eation and creale groundingpath <br />through rail (see Fig. 3. reverse side). <br />SolorMount® rail (any type) <br />Figikre 27. Insertabolt in the <br />WEEBLug aluminum rail or through the <br />cdearance hole in the stainless steel <br />flat washer. Place the stainless steel <br />flat washer on the bolt, oriented <br />so the dimples will contact the <br />aluminum rail. Place the lugportion <br />on the bolt and stainless steelflat <br />washer. Install stainless steeljlat <br />WEwasher, lock washer and nut. <br />Tightenthe nutuntil the dimples are»LID>completely embedded i'nfo the rail <br />and jug. 7'he embedded dimples make <br />Staihless Steel Flat a gas-tighi mechanical connection <br />Washer (WEEB)and ensure good electncal connection <br />between the aluminum rail and the <br />lug through the WEB. <br />Clips and luks are sold separately.r'..." <br />1LJ i ...i-- <br />EBLug <br />--.2®Mflelount® rail <br />Figure 28. UGG-1 layoutfor even <br />and odd number Of modules in row. <br />"X" denotes places to install UGC-1. <br />Even Number ofModules· in row <br />C <br />9- -- <br />r <br />- <br />Odd Number ofModulesin row <br />·::1 INIRAC <br />A HllII GROUP COMPANY <br />Pub 110617-2cc <br />June 2011 <br />© 2011 by Unirac, Inc. <br />All rights'rese,yed
The URL can be used to link to this page
Your browser does not support the video tag.