Laserfiche WebLink
(E) FP <br />(E) LIVING ROOM <br />(E) MASTER BEDROOM <br />(E) BEDROOM <br />(E) GARAGE <br />(E) BEDROOM <br />(E <br />) <br /> <br />B <br />A <br />T <br />H <br />R <br />O <br />O <br />M <br />(E) CLOSET <br />(E) CLOSET <br />(E) CLOSET <br />(E) STORE <br />ATTIC <br />FAU AA <br />(N) ENTRY <br />8' CLG <br />(N) DINING ROOM <br />(N) KITCHEN <br />8' CLG <br />(N) FRONT PORCH <br />(N) LIVING ROOM <br />(E <br />) <br /> <br />M <br />A <br />S <br />T <br />E <br />R <br /> <br />B <br />A <br />T <br />H <br />CA <br /> 2 <br />4 <br />" <br />X <br />1 <br />8 <br />" <br />. <br />CA <br /> 2 <br />4 <br />" <br />X <br />1 <br />8 <br />" <br />. <br />W <br />D <br />REFD/W <br />(N) <br />LAUNDRY/PANTRY <br />STRUCTURAL PLAN SCHEDULE <br />STRUCTURAL PLAN NOTES <br />SCALE: 1/4"=1'-0"ROOF PLAN1 <br />INDICATES TENSION STRAP <br />JOIST & HANGER SCHEDULE UNO ON PLAN <br />MARK JOIST SIZE HANGER <br />(N)RR1 2x8 @16" O.C.LRU26Z <br />INDICATES WOOD POST MARK, <br />SEE POST SCHEDULE <br />C# <br />SYMBOL DESCRIPTIONS <br />INDICATES HANGER <br />S#.## <br /># <br />INDICATES CALLOUT <br />#INDICATES REVISION ON <br />DRAWINGS <br />INDICATES VIEW# <br />S#.## <br />(N) <br />C <br />44 <br />W/B <br />C <br />4 <br />(N <br />) <br />4 <br />x <br />1 <br />0 <br />(E <br />) <br />R <br />I <br />D <br />G <br />E <br /> <br />B <br />O <br />A <br />R <br />D <br />(E)RIDGE BOA <br />R <br />D <br />(N <br />) <br />4 <br />x <br />1 <br />0 <br />(N) <br />2 <br />x <br /> <br />F <br />. <br />S <br />. <br />(N)CRICKET BY OTHERS <br />SEE ARCH. DWG. <br />(N)DBL.2x8 <br />LUS26-2 <br />HANGER <br />(N)DBL.2x8 <br />(N)DBL.2x8 <br />(N)LUS26-2 <br />HANGER <br />(N)LUS26-2 <br />HANGER <br />(N)DBL.2x6 <br />LUS26-2 <br />HANGER <br />(N)4x6 <br />(N)4x10 <br />(N)DBL.2x6 <br />LUS26-2 <br />HANGER <br />(N)4x6 <br />(N)4x6 <br />(E)DBL <br />. <br /> <br />R <br />R <br />(E)RR <br />(E)RR <br />(E)RR <br />(E)RR <br />(E)RR <br />(E)RR <br />(N)MSTC40 <br />(N)MST37 <br />POST SCHEDULE UNO ON PLAN <br />MARK POST SIZE <br />(N)C44 4x4 <br />(N)C46 4x6 <br />S1.22 <br />07 <br />TYP. <br />SCOPE OF WORK <br />(ROOF PLAN) <br />INDICATES SHEARWALL TYPE <br />FOR SHEARWALL SCHEDULE <br />SEE 1/S1.21 <br />INDICATES MINIMUM <br />LENGTH OF SHEARWALL <br />SWXX <br />(#'-#") <br />INDICATES WOOD BEAMRB <br />INDICATES JOISTJ# <br /># <br />S#.##INDICATES SECTION <br />INDICATES SHEET NUMBER <br />INDICATES DETAIL <br />NUMBER ON THE SHEET <br />REVIEW THE PLAN NOTES AND <br />PERFORM FIELD CONDITION <br />ASSESSMENT AND VERIFICATION <br />PRIOR TO COMMENCING THE WORK. <br />THE (E) ROOF MATERIAL / <br />INSULATION UNDER (N) ROOF <br />SHALL BE REMOVED. <br />(N)DBL.2x4 <br />(N)DBL.2x4 <br />(N)BEAM BELOW <br />F <br />D <br />8 <br />A <br />B <br />7 9 <br />C <br />E <br />G <br />H <br />I <br />J <br />K <br />1 2 3 4 5 6 10 11 <br />(N)RR1 <br />(N)RR1 <br />(N)RR1 <br />(N)4x10 <br />(N)4x10 (N)4x10 <br />(N)4x10 <br />(N)DBL.2x4 <br />(N)C44 <br />W/CCQ44-SDS2.5 <br />(N)C44 <br />W/CCQ44-SDS2.5 <br />1 . THE SE DR AWING A R E BA S E D ON TH E B ES T AV A I L ABLE SO UR C E S AND DO NO T AD DR ESS THE FIELD <br />CONDITIONS. THE CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS AND ALL EXISTING STRUCTURAL <br />E L E M E N T S S P E C I F I E D A S V E R I F I E D I N F I E L D (V .I .F .) P R I O R T O C O M M E N C I N G T H E W O R K . A N Y <br />DISCREPANCIES BETWEEN THESE DRAWINGS AND FIELD CONDITIONS SHALL BE REPORTED TO THE AEOR <br />A ND SEO R. NO WOR K SHALL BE PERFOR MED IN THE AFFECTED A REAS UN TIL THE DISCR EPANCIES ARE <br />RESOLVED. <br />2. NO CUTTING, DRILLING, DEMOLITION OR DESTRUCTIVE WORK ON CONCRETE OR WOOD ELEMENTS <br />SHALL BE PERMITTED UNLESS ALL REINFORCING STEEL INCLUDING PT TENDONS, BEARING WALLS, SHEAR <br />WALLS, BEAMS,AND DIRECTIONS OF JOISTS AND RAFTERS THAT WILL BE AFFECTED ARE POSITIVELY <br />IDENTIFIED. <br />3. C ONT R ACTO R IS S OLELY R E S P ONSI BLE FO R P R OTE CT I ON OF A LL S TR U C T UR AL, NO N S TR U C T UR AL, <br />ARCHITECTURAL, FINISHING, ELECTRICAL AND MECHANICAL COMPONENTS WHICH ARE NOT DESIGNATED <br />FOR DEMOLITION OR NEW CONSTRUCTION. ANY DAMAGES CAUSED BY THE CONTRACTOR OR <br />SUBCONTRACTORS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COSTS TO THE ENGINEERS OR <br />OWNER. <br />4. STRUCTURAL DRAWINGS ARE NOT STAND-ALONE DOCUMENTS AND ARE INTENDED TO BE USED IN <br />CONJUNCTION WITH CIVIL, ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND DRAWINGS FROM OTHER <br />DISCIPLINES. THE CONTRACTOR SHALL COORDINATE ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS <br />INTO THE SHOP DRAWINGS AND FIELD WORK. <br />5. ALL ELEVATIONS, SLOPES, DRAINAGE, DIMENSIONS OF OPENINGS, PENETRATIONS, DEPRESSIONS, AND <br />LAYOUT AND GEOMETRY OF NONSTRUCTURAL ELEMENT SUCH AS BUT NOT LIMITED TO PARTITION, <br />WINDOWS, PLUMBING, ARE NOT INCLUDED IN THE STRUCTURAL ENGINEERING SCOPE OF WORK AND <br />SHALL NOT BE THE RESPONSIBILITY OF THE STRUCTURAL ENGINEER. REFER TO THE DRAWINGS FROM <br />OTHER PROFESSIONS FOR THE INFORMATION MENTIONED ABOVE. <br />6. REVIEW ALL NOTES PROVIDED IN FRAMING LUMBER AND ENGINEERED WOOD PRODUCT SECTION FOR <br />GENERAL REQUIREMENTS AND CONFORMANCE OF STRUCTURAL WOOD. <br />7. FOR TYPICAL DETAILS SEE S1 SERIES SHEETS. <br />8. ROOF SHEATHING OVER ROOF RAFTER/JOISTS NOT SPACED MORE THAN 16" O.C. SHALL BE 15/32" OR <br />1/2" PS1 OR PS2 CATEGORY, APA RATED SHEATHING, 32/16 ,EXTERIOR GRADE AND WITH EXTERIOR GLUE, <br />(EXPOSURE1 OR EXTERIOR), SQUARE EDGE (OR TONGUE-AND-GROOVE). NAILS SHALL BE 8d WITH MINIMUM <br />FASTENER PENETRATION IN FRAMING WOOD FOR 1-3/8 IN. NAIL SPACING AT INTERMEDIATE FRAMING <br />(FIELD NAILING) SHALL NOT BE MORE THAN 12 IN. NAIL SPACING AT BOUNDARIES AND AT SUPPORTED <br />PANEL EDGES SHALL NOT BE MORE THAN 6 IN. IF OSB PANELS ARE USED, PANELS SHALL BE MOISTURE <br />PROTECTED DURING THE CONSTRUCTION. <br />9. ROOF SHEATHING OVER RAFTERS/JOISTS OR TRUSSES SPACED AT 24" O.C. SHALL BE 19/32" OR 5/8" PS1 <br />OR PS2 CATEGORY, APA RATED SHEATHING, 40/20 ,EXTERIOR GRADE AND WITH EXTERIOR GLUE, <br />(EXPOSURE1 OR EXTERIOR), SQUARE EDGE (OR TONGUE-AND-GROOVE) IF OSB PANELS ARE USED, PANELS <br />SHALL BE MOISTURE PROTECTED DURING THE CONSTRUCTION.THE ROOF SHEATHING TO BE APPROVED BY <br />THE BUILDING INSPECTOR BEFORE APPLICATION OF ROOFING. <br />10. FLOOR SHEATHING SHALL BE 23/32" OR 3/4" PS1 OR PS2 CATEGORY, APA RATED SHEATHING, 48/24 <br />WITH EXTERIOR GLUE, (EXPOSURE 1 OR EXTERIOR), SQUAERE EDGE (OR TONGUE-AND-GROOVE ).NAILS <br />SHALL BE 10d WITH MINIMUM FASTENER PENETRATION IN FRAMING WOOD FOR 1-3/8 IN. NAIL SPACING AT <br />INTERMEDIATE FRAMING (FIELD NAILING) SHALL NOT BE MORE THAN 12 IN. NAIL SPACING AT BOUNDARIES <br />AND AT SUPPORTED PANEL EDGES SHALL NOT BE MORE THAN 6 IN, U.N.O. ON PLANS. <br />11. BALCONY FRAMES AND SHEATHING SHALL BE EXTERIOR GRADE. BALCONY SHEATHING SHALL BE 3/4" <br />PS1 OR PS2 CATEGORY, APA RATED SHEATHING, 48/24, EXTERIOR, SQUARE EDGE (OR <br />TONGUE-AND-GROOVE ). <br />12. ROOF, FLOOR AND BALCONY PANEL EDGES SHALL HAVE APPROVED TONGUE-AND-GROOVE JOINTS OR <br />SHALL BE SUPPORTED WITH BLOCKING. 1-1/2" THICK PANELS WITH 1/4" MINIMUM THICKNESS <br />UNDERLAYMENT OR 1-1/2" OF APPROVED LIGHTWEIGHT CONCRETE PLACED OVER THE SUB-FLOOR, DO <br />NOT REQUIRE BLOCKING AT THE EDGES. <br />13. ALL EXTERIOR WALLS SHALL BE SHEATHED ON THE OUTSIDE OF THE WALL, INCLUDING GABLES, AND <br />THE CONNECTION OF THE SHEATHING TO FRAMING. SHEATHING SHALL BE 15/32" PS1 OR PS2 CATEGORY, <br />APA RATED SHEATHING, STRUCTURAL-I, WITH EXTERIOR GLUE, (EXPOSURE1 OR EXTERIOR), SQURE EDGE. <br />14. ALL SHEATHING SHALL BE LAID CONTINUOUS OVER TWO OR MORE SUPPORTS WITH FACE GRAIN <br />PERPENDICULAR TO SUPPORTS (UNLESS SHOWN OTHERWISE). STAGGER ALL SHEATHING PANELS A <br />MINIMUM OF ONE JOIST BAY. <br />15. UNO PER SHEAR WALL SCHEDULE, OR SHOWN ON THE THESE DRAWINGS ALL SHEATHING SHALL BE <br />NAILED TO THE FARMING AS FOLLOWS: <br />15.1. FASTENERS SHALL BE 10d COMMON NAILS <br />15.2. SPACING AT BOUNDARIES AND AT SUPPORTED PANEL EDGES SHALL NOT BE MORE THAN 6 IN. <br />15.3. SPACING AT INTERMEDIATE FRAMING (FIELD NAILING, F.N.) SHALL NOT BE MORE THAN 12 IN. <br />15.4. FASTENER PENETRATION IN FRAMING WOOD SHALL NOT BE LESS THAN 1-1/2 IN. <br />15.5. BLOCK ALL EDGES <br />15.6. USE 3X LUMBER AT THE CONNECTION OF TWO PANEL EDGES, UNO ON PLANS OR DETAILS. <br />16. ROOF PLYWOOD SHEATHING SHALL BE CONTINUED BENEATH THE CALIFORNIA FRAMING, IF <br />APPLICABLE. <br />17. ALL WOOD STRUCTURAL PANEL JOINT AND SILL PLATE NAILING SHALL BE STAGGERED AT ALL PANEL <br />EDGES. <br />18. BEARING WALLS SHALL BE SHEATHED ON NOT LESS THAN ONE SIDE OR BRIDGING SHALL BE INSTALLED <br />NOT GREATER THAN 4 FEET APART MEASURED VERTICALLY FROM EITHER END OF THE STUD. 2x BLK'G <br />SHALL BE PROVIDED AT PLYWOOD JOINTS FOR ALL WALLS. <br />19. ROOF AND FLOOR DIAPHRAGM NAILING SHALL BE INSPECTED BEFORE COVERING. <br />20. NO PENETRATIONS ARE ALLOWED THROUGH SHEARWALL UNLESS SPECIFICALLY DETAILED ON THESE <br />NOTES. <br />21. ALL POST TO BEAM AND BEAM TO POST SHALL BE CONNECT W/ CCQ/ECCQ UNO ON PLAN. <br />22. ALL BEAMS ARE FLUSH (NOT DROPPED) UNO ON PLAN. <br />23. EXTERIOR CONSTRUCTION INCLUDING BALCONY, PATIO LUMBERS AND TIMBERS SHALL BE <br />PRESSURE-TREATED AND GRADE 1 OR BETTER AND CLASSIFIED FOR EXTERIOR CONSTRUCTION, DECK <br />BOARDS, JOISTS & BEAM ABOVE GROUND SHALL BE CATEGORY 3B OR HIGHER AND POSTS SHALL BE <br />CATEGORY 4A OR HIGHER AS SPECIFIED BY AWPA STANDARD U1. <br />24. PATIO COVER SHEATHING OVER JOISTS NOT SPACED MORE THAN 24" O.C. SHALL BE 19/32" APA RATED <br />WITH SPAN RATING 32/16 EXTERIOR EXPOSURE. NAILS SHALL BE 8D WITH MINIMUM FASTENER <br />PENETRATION IN FRAMING WOOD OF 1-3/8 INCHES. NAIL SPACING AT INTERMEDIATE FRAMING FIELD <br />NAILING) SHALL BE MORE THAN 12 IN. NAIL SPACING AT BOUNDARIES AND AT SUPPORTED PANEL EDGES <br />SHALL NOT BE MORE THAN 6 IN. <br />25. IF EXISTING CONSTRUCTION IS INCLUDED IN THIS SCOPE OF WORK, ABOVE MENTIONED SHEATHING <br />REQUIREMENT SHALL BE VERIFIED FOR EXISTING ROOF, FLOOR, AND WALLS THAT ARE INCLUDED WITH <br />THIS SCOPE OF WORK.SEE GYPSUM BOARD AND EXPANDED METAL OR WOVEN WIRE LATH AND PORTLAND <br />CEMENT PLASTER (STUCCO) FOR THE INSTALLATION OF STUCCO AND DRYWALLS. <br />26. SEE TYPICAL WALL DETAILS FOR THE ADDITIONAL INFORMATION ON HEADERS, KING STUDS AND JACK <br />STUDS. <br />27. SEE GYPSUM BOARD AND EXPANDED METAL OR WOVEN WIRE LATH AND PORTLAND CEMENT PLASTER <br />(STUCCO) NOTES FOR THE INSTALLATION OF STUCCO AND DRYWALLS. <br />28. SOLAR PANEL DESIGN AND CONNECTIONS TO THE SUPPORTING ELEMENTS ARE NOT INCLUDED IN THE <br />STRUCTURAL SCOPE OF WORK. A MAXIMUM DEAD-LOAD OF 3 PSF WAS CONSIDERED IN THE STRUCTURAL <br />DESIGN. THE GC SHALL INFORM STRUCTURAL ENGINEER IN WRITING, IF A HEAVIER SOLAR SYSTEM IS USED <br />IN CONSTRUCTION. <br />29.ALL HANGERS ,COLUMN CAPS ,AND COLUMN BASES ARE MINIMUM REQUIREMENTS ,PRIOR TO ORDER ALL <br />OF THEM SHALL BE CHECKED BY THE CONTRACTOR / FRAMER ANY DISCREPANCY SHALL BE REPORTED TO <br />SEOR. <br />30. ALL STEEL CONNECTORS INCLUDING BOLTS, SCREWS AND NAILS USED IN EXTERIOR STRUCTURE OR <br />EXPOSED TO WEATHER SHALL BE STAINLESS STEEL OR HOT-DIP GALVANIZED. FASTENERS IN <br />PRESERVATIVE TREATED WOOD OR FIRE RETARDANT TREATED WOOD SHALL BE OF HOT DIPPED ZINC <br />COATED GALVANIZED STEEL OR STAINLESS STEEL. <br />31. PROVIDE ONE INTERMEDIATE AND END FULL HEIGHT SOLID BLOCKING ALONG ALL THE JOISTS BEAMS <br />AND RAFTERS WITH SPANS GREATER THAN 8 FT BUT LESS THAN 16 FT. THE INTERMEDIATE BLOCKING <br />SHALL BE SPACED MID-SPAN OF THE JOIST. <br />32. PROVIDE TWO INTERMEDIATE AND END FULL HEIGHT SOLID BLOCKING ALONG ALL THE JOISTS BEAMS <br />AND RAFTERS WITH SPANS GREATER THAN 16 FT BUT LESS THAN 24 FT. THE INTERMEDIATE BLOCKING <br />SHALL BE SPACED 1/3 OF THE SPAN FROM EACH END. <br />33. PROVIDE THREE INTERMEDIATE AND END FULL HEIGHT SOLID BLOCKING ALONG ALL THE JOISTS BEAMS <br />AND RAFTERS WITH SPANS GREATER THAN 24 FT. THE INTERMEDIATE BLOCKING SHALL BE SPACED NOT <br />MORE THAN 8 FT ALONG THE SPAN FROM EACH OTHER. <br />34. THE LOCATION ,DIMENSIONS ,AND SPECIFIC REQUIREMENTS FOR MECHANICAL EQUIPMENT PADS , <br />INCLUDING HEAT PUMP UNITS AND CONDENSERS ,SHALL BE COORDINATED BY THE ARCHITECT WITH THE <br />MECHANICAL ENGINEER ,EQUIPMENT MANUFACTURER ,AND OTHER RELEVANT DISCIPLINES .FINAL PAD <br />DIMENSIONS ,CLEARANCES ,ANCHORAGE REQUIREMENTS ,AND EQUIPMENT LOADS SHALL BE PROVIDED BY <br />THE MECHANICAL ENGINEER AND/OR MANUFACTURER. <br />35. THE STRUCTURAL ENGINEER OF RECORD (SEOR )SHALL PROVIDE THE STRUCTURAL DESIGN OF THE PAD <br />(E.G ,.THICKNESS ,REINFORCEMENT )BASED SOLELY ON THE MECHANICAL LOADING AND LOCATION <br />INFORMATION FURNISHED BY OTHERS .THE SEOR ASSUMES NO RESPONSIBILITY FOR DETERMINING <br />EQUIPMENT LOCATION ,UTILITY COORDINATION ,ACCESSIBILITY ,SERVICE CLEARANCE ,VIBRATION <br />ISOLATION ,OR CONFORMANCE WITH MECHANICAL/ELECTRICAL CODES. <br />36. ANY CHANGE IN EQUIPMENT WEIGHT ,CONFIGURATION ,OR LAYOUT SHALL BE COMMUNICATED TO THE <br />SEOR FOR VERIFICATION OF STRUCTURAL ADEQUACY PRIOR TO CONSTRUCTION. <br />09 <br />S1.23 <br />TYP. <br />SW1 <br />(30'-7") <br />(N) <br />C <br />4 <br />4 <br />SW <br />1 <br />(1 <br />6 <br />' <br />- <br />1 <br />0 <br />" <br />) <br />(N) <br />C <br />4 <br />4 <br />(N) <br />C <br />4 <br />4 <br />(N) <br />C <br />4 <br />4 <br />(N) <br />C <br />4 <br />6 <br />(N) <br />C <br />4 <br />4 <br />(N) <br />C <br />4 <br />4 <br />(S <br />W <br />1 <br />) <br />(1 <br />5 <br />' <br />- <br />6 <br />" <br />) <br />(N) <br />C <br />4 <br />4 <br />SW <br />1 <br />(1 <br />8 <br />' <br />- <br />1 <br />" <br />) <br />(N) <br />C <br />4 <br />4 <br />(N)HFX 24x14 HARDY PANEL <br />ANCHOR BOLT 1-1/8-HS-RA <br />FOR TOP AND BOT. CONNECTION <br />SEE DETAILS 6&4/HFX.01. <br />SEE NOTE A. <br />(N)MSTA49 <br />@48" O.C. <br />(N)MSTC40 <br />(N)MSTC40 <br />(N)MSTC40 <br />(N)C46 <br />W/BC46 <br />(N)RR1 <br />01 <br />S4.02 <br />06 <br />S4.02 <br />SEE 6/S1.22 <br />(TYP.) <br />(N) <br />C <br />4 <br />4 <br />W/B <br />C <br />4 <br />(N) <br />C <br />4 <br />4 <br />W/C <br />C <br />Q <br />4 <br />4 <br />- <br />S <br />D <br />S <br />2 <br />. <br />5 <br />SEE DETAIL <br />4/S1.26 <br />(N) <br />C <br />4 <br />4 <br />SW <br />1 <br />(5 <br />' <br />- <br />0 <br />" <br />) <br />(N) <br />C <br />4 <br />4 <br />(E)BRA <br />C <br />E <br />D <br /> <br />L <br />I <br />N <br />E <br />(E)BRACED LINE <br />(E <br />) <br />B <br />R <br />A <br />C <br />E <br />D <br /> <br />L <br />I <br />N <br />E <br />(E <br />) <br />B <br />R <br />A <br />C <br />E <br />D <br /> <br />L <br />I <br />N <br />E <br />(N <br />) <br />B <br />L <br />O <br />C <br />K <br />E <br />D <br />DI <br />A <br />P <br />H <br />R <br />A <br />G <br />M <br />W/ <br />8 <br />d <br />@ <br />4 <br />" <br /> <br />O <br />. <br />C <br />. <br /> <br />B <br />. <br />N <br />. <br />(N)RR1 <br />(N)MST48 <br />(N)MST48 <br />(N)MST48 <br />(N) <br />C <br />4 <br />4 <br />(N)MST48 <br />(N)MST48 <br />(N)MST48 <br />(N)MST37 <br />(N)MST48 <br />(N)4x6 <br />(E)RR <br />(E <br />) <br />P <br />U <br />R <br />L <br />I <br />N <br />(E <br />) <br />P <br />U <br />R <br />L <br />I <br />N <br />(N)MST48 <br />(N)MST48 <br />(N)MST48 <br />(N)MSTA49 <br />@48" O.C. <br />(N)MST48 <br />(N)MST48 <br />(N)HUC410-SLD <br />AND SKR AS <br />PER ARCH. DWG. <br />HANGER <br />(N) <br />C <br />4 <br />4 <br />W/B <br />C <br />4 <br />(N)CS14 <br />W/3'-0" LENGTH@EACH ENDS <br />W/2xRAFTERS OR 2xBLK'G <br />(N)MSTA49 <br />@48" O.C. <br />(N)MSTA49 <br />@48" O.C. <br />USE SIMPSON GA1 W/(4)#9x1 1 <br />2" <br />SD SCREW BOTH SIDE FOR <br />CONNECTION TO DROP BEAM <br />BELOW <br />STRAP SCHEDULE U.N.O. ON PLAN <br />MODEL MIN. FASTENER MIN. END LENGTH <br />CS14 (30) 0.131 x 2 1 <br />2 16" <br />(N)RR1 <br />(N)RR1 <br />FOR RAISED WALL <br />SEE DETAIL 5/S1.26 <br />(N)MST48 <br />HFX(2'-0") <br />(N)MST48 <br />NOTE: <br />A.CONTRACTOR SHALL V.I.F NET HEIGHT BELOW EXISTING FLOOR <br />FRAMING AND INFORM THE EOR IN WRITING BEFORE ORDER THE <br />HARDY FRAME. <br />SW <br />1 <br />(8 <br />' <br />- <br />1 <br />1 <br />" <br />) <br />(N)MST48 <br />W/DBL. RR1 <br />OR 4xBLK'G <br />(N)MSTA49 <br />(E <br />) <br />R <br />I <br />D <br />G <br />E <br /> <br />B <br />O <br />A <br />R <br />D <br />(V <br />. <br />I <br />. <br />F <br />. <br />) <br />(N)RR1 <br />(E)2x6 TIE@24" O.C. <br />CONNECTION TO RAFTERS <br />W/7-16d EACH ENDS <br />(V.I.F./SEE NOTE #1 OF <br />PLAN NOTES/ TYP.) <br />BASED ON THE FIELD CONDITIONS, <br />THE FRAMING AROUND A SKYLIGHT <br />MAY BE CHANGED. <br />SW1 <br />(23'-2") <br />TYP. <br />06 <br />S1.26(N)MST37 <br />03 <br />S4.02 <br />04 <br />S4.02 <br />09 <br />S1.23 <br />02 <br />S4.02 <br />W/C <br />C <br />Q <br />4 <br />4 <br />- <br />S <br />D <br />S <br />2 <br />. <br />5 <br />(N) <br />C <br />4 <br />4 <br />(N)2x6 <br />05 <br />S4.02 <br />12 <br />S4.01 <br />PROJECT <br />CLIENT <br />0'2'4'8'16' <br />SHEET TITLE <br />FOR FIELD VERIFICATION AND <br />CITY PERMIT ONLY <br />922 W PARK LN, <br />SANTA ANA, CA 92706 <br />SAZAN INC. <br />77 Waldorf, Irvine, CA 92612 <br />KAWEHI HOLOMALIA, <br />KEKANI112299@YAHOO.COM <br />S2.22 <br />ROOF PLAN <br />07/07/2025 <br />EXP. 06-30-2026