Laserfiche WebLink
PHOTOVOLTAIC SYSTEM - SANTA ANA DOWNTOWN PLAZA <br /> 407 E 1st ST., SANTA ANA, CA 92701 <br /> 419 E 1st ST., SANTA ANA, CA 92701 <br />VICINITY MAP: <br />System Specifications: <br />Contact Info: <br />SCOPE OF WORK: <br />ALL ELECTRICITY GENERATED IS FOR CONSUMPTION ON SITE. <br />SYSTEM ELECTRICAL CONNECTION TO MAIN ELECTRICAL SERVICE IS AT 208Y/120V SWITCHGEAR. <br />PERMIT SHALL INCLUDE LABOR OF INSTALLING PANELS, RUNNING OF ELECTRICAL CONDUITS, <br />INSTALLATION OF NEW ELECTRICAL EQUIPMENT AND ELECTRICAL CONNECTION TO EXISTING <br />BUILDING SERVICE. <br />NO BATTERIES REQUIRED AS PART OF THIS PROJECT SCOPE. <br />• 407 E. First Street: Install roof-mounted photovoltaic system (96 panels) on existing commercial building under <br />Plan Check No. 101124531 <br />• 419 E. First Street: Install roof-mounted photovoltaic system (269 panels) on existing commercial building <br />under Plan Check No. 101124532 <br />CODE REFERENCES: <br />1. 2022 CALIFORNIA ELECTRICAL CODE (CEC) . <br />2. 2022 CALIFORNIA FIRE CODE (CFC). <br />3. 2022 CALIFORNIA BUILDING CODE (CBC). <br />4. 2022 CALIFORNIA GREEN BUILDING CODE (CGC). <br />AERIAL VIEW: <br />N <br />N <br />Table of Contents: <br />SYSTEM SUMMARY <br />SYSTEM SIZE:211.7 KWSTC, 149.4 KWAC; <br />MODULES DETAILS:(365) ZNSHINE SOLAR ZXM7-UHLDD144-580/N (580W) <br />INVERTER DETAILS:(5) GINLONG S6-GC30K-LV-US [208V][SI1-SB] <br />ARRAY SQUARE FOOTAGE 10149.2 <br />ARRAY WEIGHT (LBS)25347.6 <br />APPLICABLE CODE CEC 2022, CBC 2022, CFC 2022 <br />CONSTRUCTION TYPE COMMERCIAL <br />ASHRAE STATION TUSTIN MCAF <br />ASHRAE 2% HIGH DESIGN TEMP. DB 31 <br />ASHRAE MIN MEAN EXTREME ANNUAL DB 2 <br />CONTRACTOR NOTES <br />1. THESE CONSTRUCTION DOCUMENTS HAVE BEEN BASED ON FIELD INSPECTIONS AND OTHER INFORMATION AVAILABLE AT THE TIME. ACTUAL FIELD <br />CONDITIONS MAY REQUIRE MODIFICATIONS IN CONSTRUCTION DETAILS. <br />2. CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TOOLS, ETC. <br />3. CONTRACTOR SHALL OBTAIN ALL PERMITS, APPROVALS, AFFIDAVITS, CERTIFICATIONS, ETC. AND PAY ALL FEES AS REQUIRED BY THE LOCAL <br />AUTHORITIES. <br />4. CONTRACTOR HAS THE FULL RESPONSIBILITY TO CHECK AND VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. ANY DISCREPANCIES SHALL BE <br />REPORTED TO THE ENGINEER BEFORE PROCEEDING WITH THE WORK. ANY WORK STARTED BEFORE CONSULTATION AND ACCEPTANCE BY THE <br />ENGINEER SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE SUBJECT TO CORRECTION BY THEM WITHOUT ADDITIONAL <br />COMPENSATION. <br />5. DAMAGE CAUSED TO THE EXISTING STRUCTURE, PIPES, DUCTS, WINDOWS, WALLS, FLOORS, ETC. SHALL BE REPAIRED TO THE ORIGINAL CONDITION <br />OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST. <br />6. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE PROPER INSTALLATION AND COMPLETION OF THE WORK WITH APPROVED MATERIALS. <br />7. NO CHANGES TO THE BUILDING TO BE MADE WITHOUT THE CONSULTATION AND APPROVAL OF THE ARCHITECT. <br />8. THE CONTRACTOR SHALL PERFORM THE WORK IN STRICT CONFORMANCE WITH THE LOCAL LAWS, REGULATIONS AND THE NATIONAL ELECTRICAL <br />CODE. <br />GENERAL NOTES <br />1. MODULE MANUFACTURER, MAKE, MODEL AND NUMBER OF MODULES MATCH THE APPROVED PLANS. (CBC 107.4) <br />2. DC PV MODULES ARE LISTED TO UL 1703. AC MODULES ARE LISTED TO UL 1703 AND UL 1741. (CEC 110.3, 690.4(B) & CBC 1510.7) <br />3. MODULES ARE ATTACHED TO THE MOUNTING STRUCTURE ACCORDING TO THE MANUFACTURER'S INSTRUCTIONS AND THE APPROVED PLANS. <br />(CEC 110.3(B) & CBC 107.4) <br />4. PV INSTALLATION SHALL COMPLY WITH REQUIREMENTS OF THE STANDARD PLAN. <br />5. PV SYSTEM OPERATING AT 80 VOLTS OR GREATER SHALL BE PROTECTED BY A LISTED DC ARC FAULT PROTECTION. (CEC 690.11) <br />6. ALL WORK DONE IN A NEAT AND WORKMANLIKE MANNER. (CEC 110.12) <br />T001 - TITLE PAGE <br />A100 - SITE PLAN <br />A101 - BUILDING ELEVATION-1 <br />A102 - BUILDING ELEVATION-2 <br />A200 - ARRAY PLAN <br />E001 - ELECTRICAL NOTES <br />E100 - ELECTRICAL SITE PLAN <br />E200 - SINGLE LINE DIAGRAM <br />E300 - GROUNDING LINE DIAGRAM <br />E400 - WIRING SCHEDULE <br />E501 - EQUIPMENT LAYOUT PLAN-1 <br />E502 - EQUIPMENT LAYOUT PLAN-2 <br />E601 - ELECTRICAL DETAILS-1 <br />E602 - ELECTRICAL DETAILS-2 <br />E603 - VARIANCE DRAWING <br />E700 - LABELS & MARKINGS <br />E800 - SPEC SHEETS <br />(N) PROJECT LOCATION <br />(N) PROJECT LOCATION <br />OWNER: <br />SANTA ANA DOWNTOWN PLAZA <br />407 E 1st ST., <br />SANTA ANA, CA 92701 <br />419 E 1st ST., <br />SANTA ANA, CA 92701 <br />GENERAL CONTRACTOR: <br />SPRECK ENERGY <br />3000 F DANVILLE BLVD., SUITE 422, <br />ALAMO, CA 94507 <br />ELECTRICAL ENGINEER: <br />PEARCE RENEWABLES <br />1222 VINE STREET, SUITE 301, <br />PASO ROBLES, CA 93446 <br />Email: jeffrey.ansley@pearce-services.com <br />TEL: 925 412 4622 <br />(N) PV ARRAY <br />INSTALLATION AREA <br />(N) PV ARRAY <br />INSTALLATION AREA <br />STRUCTURAL SHEETS <br />S101 - S112 - STRUCTURAL SHEETS <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />D <br />O <br />W <br />T <br />O <br />W <br />N <br /> <br />P <br />L <br />A <br />Z <br />A <br />40 <br />7 <br /> <br />E <br /> <br />1 <br />s <br />t <br /> <br />S <br />T <br />. <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />JO <br />B <br /> <br />N <br />U <br />M <br />B <br />E <br />R <br />: <br />AP <br />N <br />: <br /> <br />3 <br />9 <br />8 <br />- <br />5 <br />1 <br />6 <br />- <br />1 <br />9 <br />SP <br />R <br />E <br />C <br />K <br /> <br />S <br />O <br />L <br />A <br />R <br /> <br />& <br /> <br />D <br />E <br />S <br />I <br />G <br />N <br />30 <br />0 <br />0 <br /> <br />F <br /> <br />D <br />A <br />N <br />V <br />I <br />L <br />L <br />E <br /> <br />B <br />L <br />V <br />D <br />. <br />, <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />4 <br />2 <br />2 <br />AL <br />A <br />M <br />O <br />, <br /> <br />C <br />A <br /> <br /> <br />9 <br />4 <br />5 <br />0 <br />7 <br />41 <br />9 <br /> <br />E <br /> <br />1 <br />s <br />t <br /> <br />S <br />T <br />. <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />Bldg #'s 101124531 & 32 <br />Elect #'s 20186557 & 58 <br />APPROVALS: <br />PLNG - N. Liu <br />BLDG - A. SoPUBLIC WORKS - Y. <br />Soto <br />ELECT - M. Smith