Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This document is a Property of BTCPower Inc. and shall not be <br />copied, reproduced, or used as the basis for sale or manufacture <br />of apparatus without written permission. <br />23-Sep-22 Rev D <br />360kW High Power DC Charger <br />INSTALLATION AND USER’S MANUAL <br />Page 19 of 89 <br />PRE-INSTALLATION <br /> <br />5.4. List of Parts, Materials, and Tools Needed for Installation <br />Parts & Materials Needed to Purchase <br />Item Part Description Quantity Remarks <br />1 OM3, multimode, 50/125µm, <br />ST connectors on both ends <br /> 1 pair per dispenser Recommended suppliers: <br />https://fibercablesdirect.com/ <br />2 18AWG Twisted Pair, Shielded, <br />Interlock Cable <br />1 pair per dispenser <br />3 DC Wire 1-2 Pair per dispenser <br />(Parallel option <br />recommended) <br /> <br />4 480VAC Single Phase Wire 1 pair per dispenser (L1, <br />L2, Ground) <br /> <br />*Note: Extra sets of Fiber Optic Connectors are needed as back-up since these are brittle. <br /> <br /> <br />Tools/Materials Needed during Installation <br />Item Part Description Quantity <br />1 Philips Head Screwdriver 1 <br />2 ½” x 4” Concrete Expansion Bolt <br />10 or 16 (Depending on <br /># of Dispensers being <br />installed) <br />3 ½” Torque Wrench 1 <br />4 Allen Wrench Set 1 <br />5 Keys (shipped with the unit) 1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />