Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This document is a Property of BTCPower Inc. and shall not be <br />copied, reproduced, or used as the basis for sale or manufacture <br />of apparatus without written permission. <br />23-Sep-22 Rev D <br />360kW High Power DC Charger <br />INSTALLATION AND USER’S MANUAL <br />Page 23 of 89 <br />INSTALLATION <br /> <br />7.1. Moving and Hoisting Instructions <br /> <br />CAUTION <br />Improper handling may result to severe injury and/or damage to the unit due to dropping or <br />falling. Make sure to follow specified procedures for hoisting operations. Take necessary <br />measures to prevent falling when moving or hoisting the unit. <br /> <br />Using Forklift or Pallet Jack <br />• Care should always be taken when lifting the charger using a forklift or pallet jack. <br />• Forks should be extended completely under the unit to avoid accidents. <br />Using Lifting Eye Bolts <br />The Power Unit / Tower comes with four (4) M12 Lifting Eye Bolts positioned at each corner of the <br />unit enclosure’s top surface. <br />The Working Load Limit (WLL), commonly referred as Lifting Capacity, of the M12 Lifting Eye Bolt <br />is 0.34t or equivalent to 680 lbs. Eye bolt capacity reduces as the horizontal angle decreases. <br />Use eye bolts at a vertical angle of no more than 15°. Eye bolt strength at 15° angle drops down <br />to 80% of vertical lifting capacity. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />