Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This document is a Property of BTCPower Inc. and shall not be <br />copied, reproduced, or used as the basis for sale or manufacture <br />of apparatus without written permission. <br />23-Sep-22 Rev D <br />360kW High Power DC Charger <br />INSTALLATION AND USER’S MANUAL <br />Page 29 of 89 <br />INSTALLATION <br />Power Unit / Tower Footer Drawing <br />The illustration below shows the drilling layout for the Power Unit / Tower. Four (4) points are <br />needed to fix the unit on the concrete pad. The front mounting holes MUST be used, but for the <br />rear, either set of the back mounting holes may be used. The conduit entry to the unit is also <br />shown. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Base foundation template for alignment and hole location is available in .step or .dxf files upon <br />request. <br /> <br />NOTE <br />The bottom of the tower needs to be sealed to the ground. <br />