Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This document is a Property of BTCPower Inc. and shall not be <br />copied, reproduced, or used as the basis for sale or manufacture <br />of apparatus without written permission. <br />23-Sep-22 Rev D <br />360kW High Power DC Charger <br />INSTALLATION AND USER’S MANUAL <br />Page 37 of 89 <br />INSTALLATION <br /> <br />Dispenser DC Grounding <br /> <br />The dispenser must have a common direct ground with the Power Unit / Tower. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Torque Requirement: <br />Copper Ground Lugs: 16 lb-ft <br />