Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This document is a Property of BTCPower Inc. and shall not be <br />copied, reproduced, or used as the basis for sale or manufacture <br />of apparatus without written permission. <br />23-Sep-22 Rev D <br />360kW High Power DC Charger <br />INSTALLATION AND USER’S MANUAL <br />Page 40 of 89 <br />INSTALLATION <br /> <br />Fiber-Optic and Interlock Routing Information <br /> <br />The Fiber-Optic and Interlock Cables must be routed through the panduit. This is to prevent <br />damage to the cable from the front door and cable management. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Remove this panduit cover <br />and route the interlock and <br />fiber-optic cables through <br />the panduit