My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 W McFadden Ave-EV Chargers - Plan
PBA
>
Building
>
ProjectDox
>
M
>
McFadden Ave
>
3600 W McFadden Ave
>
3600 W McFadden Ave-EV Chargers - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:02:50 AM
Creation date
2/13/2026 5:00:30 AM
Metadata
Fields
Template:
Plan
Permit Number
20185230
101122589
Full Address
3600 W McFadden Ave
Street Number
3600
Street Direction
W
Street Name
McFadden
Street Suffix
Ave
Document Relationships
101122589 - Permit
(Permit - Plan)
Path:
\Building\Permits\M\McFadden Ave\3600 W McFadden Ave
20185230 - Permit
(Permit - Plan)
Path:
\Building\Permits\M\McFadden Ave\3600 W McFadden Ave
Text box
ID:
1
Creator:
Import Agent
Created:
2/13/2026 5:00 AM
Modified:
2/12/2026 10:02 AM
Text:
file:///C:/Users/dsanchez/Downloads/dispatch@btcpower.com
ID:
2
Creator:
Import Agent
Created:
2/13/2026 5:00 AM
Modified:
2/12/2026 10:02 AM
Text:
file:///C:/Users/dsanchez/Downloads/dispatch@btcpower.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This document is a Property of BTCPower Inc. and shall not be <br />copied, reproduced, or used as the basis for sale or manufacture <br />of apparatus without written permission. <br />23-Sep-22 Rev D <br />360kW High Power DC Charger <br />INSTALLATION AND USER’S MANUAL <br />Page 44 of 89 <br />VERIFICATION AND INSPECTION <br /> <br />8. Verification and Inspection <br />Commissioning <br />Prior and during system start-up, perform verification and inspection on both tower and <br />dispenser/s using the 360kW HPDC Charger Commissioning Checklist which was provided <br />together with this manual. <br />All instructions listed in the commissioning checklist are considered mandatory and must be <br />carried out by the contractor in-charge of the commissioning. Required information and actual <br />measured data shall be filled-in as well. <br />For any issues, concerns, or questions during commissioning, please email to <br />dispatch@btcpower.com or call 1-855-901-1558. <br />After successful commissioning, email the completed commissioning checklist to <br />dispatch@btcpower.com. <br />
The URL can be used to link to this page
Your browser does not support the video tag.