Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This document is a Property of BTCPower Inc. and shall not be <br />copied, reproduced, or used as the basis for sale or manufacture <br />of apparatus without written permission. <br />23-Sep-22 Rev D <br />360kW High Power DC Charger <br />INSTALLATION AND USER’S MANUAL <br />Page 46 of 89 <br />OPERATION <br /> <br />Tower <br />• SWITCH ON the auxiliary breaker inside the Tower as shown below. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />• SWITCH ON the circuit breakers inside the Tower as shown below. (Proceed to section 9.1.1 <br />on resetting the breaker/GFCI if tripped.) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />• Then, SWITCH ON the Main Panel Breaker.