Laserfiche WebLink
COVER PAGE <br /> NEW PHOTOVOLTAIC SYSTEM 223.59 KW DC & 187.5 KW AC <br />3220 S FAIRVIEW ST, SANTA ANA, CA 92704, USA <br />GENERAL NOTES VICINITY MAP <br />SATELLITE VIEW <br />SHEET INDEX <br />COVER PAGET-001 <br />G-001 <br />A-101 SITE PLAN <br />RESOURCE DOCUMENTS <br />1.1.1 PROJECT NOTES: <br />1.1.2 THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE <br />CALIFORNIA ELECTRIC CODE (CEC) ARTICLE 690, ALL MANUFACTURERS’S <br />LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS <br />SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE <br />CODES. <br />1.1.3 THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED <br />AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION <br />1.1.4 GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS <br />ACCORDANCE WITH CEC 690.41(B) <br />1.1.5 ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE <br />INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND <br />LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY CEC 690.4: <br />PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE <br />INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL <br />1703 OR UL 1741 ACCESSORY <br />1.1.6 MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED <br />TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE <br />CALCULATED ACCORDING TO CEC 690.7. <br />1.1.7 ALL INVERTERS, PHOTOVOLTAIC MODULES,PHOTOVOLTAIC PANELS, <br />AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC <br />POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION <br />PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS <br />FROM LISTING OR LABELING [CEC 110.3]. <br />1.1.8 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING <br />CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES <br />AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE CEC AND AHJ. <br />1.2.1 SCOPE OF WORK: <br />1.2.2 PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND <br />SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. <br />PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING <br />ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR <br />ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN <br />THIS DOCUMENT <br />1.2.3 INSTALLING CONTRACTOR IS RESPONSIBLE FOR FOLLOWING <br />EQUIPMENT MANUFACTURER'S INSTALLATION AND COMMISSIONING MEANS <br />AND METHODS. <br />1.3.1 WORK INCLUDES: <br />1.3.2 PV RACKING SYSTEM INSTALLATION - UNIRAC RMDT RACKING <br />1.3.3 PV MODULE AND INVERTER INSTALLATION - HANWHA Q CELLS <br />Q.TRON BLK M-G2+ (435W) MODULES / SMA SUNNY TRIPOWER CORE1 <br />STP 62-US-41 (480V) INVERTERS <br />1.3.4 PV EQUIPMENT ROOF MOUNT <br />1.3.5 PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX <br />1.3.6 PV LOAD CENTERS (IF INCLUDED) <br />1.3.7 PV METERING/MONITORING (IF INCLUDED) <br />1.3.8 PV DISCONNECTS <br />1.3.9 PV GROUNDING ELECTRODE & BONDING TO (E) GEC <br />1.3.10 PV FINAL COMMISSIONING <br />1.3.11 (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV <br />1.3.12 SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE <br />PROJECT INFORMATION <br />PROJECT NAME <br />NAME: <br />ELECTRICAL PLAN <br />ELECTRICAL CALCULATIONS <br />A-102 <br />E-602 <br />R-001-R-006 <br />WAXIE SANTA ANA <br />NOTES <br />PLACARDE-604 <br />CONTRACTOR INFORMATION: <br />CONTRACTOR NAME: PALOMAR SOLAR LTD <br />PROJECT MANAGER: CURTIS WILLIAMSON <br />EMAIL: support@palomarsolar.com <br />RE <br />V <br />SHEET TITLE <br />DA <br />T <br />E <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />S <br />SI <br />G <br />N <br />A <br />T <br />U <br />R <br />E <br /> <br />W <br />I <br />T <br />H <br /> <br />S <br />E <br />A <br />L <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br /> <br />& <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />DRAWN DATE <br />DRAWN BY <br />04/02/2025 <br />VA <br />SHEET NUMBER <br />REVIEWED BY NGK <br />T-001 <br />WA <br />X <br />I <br />E <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />32 <br />2 <br />0 <br /> <br />S <br /> <br />F <br />A <br />I <br />R <br />V <br />I <br />E <br />W <br /> <br />S <br />T <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />, <br />US <br />A <br />A. <br />0 <br />PE <br />R <br />M <br />I <br />T <br /> <br />P <br />L <br />A <br />N <br />CONTRACTOR <br />GREENTECH <br />RENEWABLES <br />PALOMAR SOLAR LTD <br />1526 STERLING COURT <br />ESCONDIDO, CA 92029, USA <br />PHONE NO- (760) 540-0388 <br />LICENCE NO - C10-945152 <br />04 <br />/ <br />0 <br />2 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />NO <br />T <br /> <br />F <br />O <br />R <br /> <br />C <br />O <br />N <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />N <br /> <br />U <br />N <br />L <br />E <br />S <br />S <br /> <br />S <br />I <br />G <br />N <br />E <br />D <br /> <br />B <br />Y <br /> <br />T <br />H <br />E <br />CO <br />N <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br /> <br />O <br />R <br /> <br />S <br />E <br />A <br />L <br />E <br />D <br /> <br />B <br />Y <br /> <br />P <br />R <br />O <br />F <br />E <br />S <br />S <br />I <br />O <br />N <br />A <br />L <br /> <br />E <br />N <br />G <br />I <br />N <br />E <br />E <br />R <br />WARNING LABELSE-603 <br />ELECTRICAL LINE DIAGRAME-601 <br />SCOPE OF WORK <br />SYSTEM SIZE : STC : 514 X 435W= 223.59 kW DC <br /> PTC : 514 X 408W = 209.71 kW DC <br />CEC AC RATING: 204.46 kW AC <br /> AC SIZE: 187.5 kW AC <br />(514) HANWHA Q CELLS Q.TRON BLK M-G2+ (435W) MODULES <br />(03) SMA SUNNY TRIPOWER CORE1 STP 62-US-41 (480V) INVERTERS <br />AUTHORITIES HAVING JURISDICTION <br />BUILDING : CITY OF SANTA ANA <br />UTILITY : SCE <br /> ATTACHMENT TYPE: <br />DESIGN SPECIFICATION <br />OCCUPANCY - GROUP B <br />CONSTRUCTION - TYPE 2 <br />ZONING - CITY OF SANTA ANA <br />GROUND SNOW LOAD - 0 PSF <br />WIND EXPOSURE - B <br />WIND SPEED - 95 MPH <br />RISK CATEGORY - II <br />BUILDING HEIGHT -40 FT <br />APPLICABLE CODES & STANDARDS <br />BUILDING: CBC 2022, CMC 2022 <br />CPC 2022, CEBC 2022 <br />ELECTRICAL: CEC 2022 <br />FIRE: CFC 2022 <br /> MSP UPGRADE: NO <br />UNIRAC RMDT RACKING <br />ATTACHMENT PLANA-103-A103.1 <br />Signed 4/04/2025 <br />S-1-S-2 TKJ STRUCTURAL DRAWINGS <br />EXISTING PV SYSTEM AT 3220 S FAIRVIEW ST. HAS BEEN REMOVED <br />UNDER DEMO PERMITS 101122489/20185150 <br />Bldg #101123299 & Elect #20185611 <br />APPROVALS: <br />PLNG - C. Santana <br />BLDG - G. Huang <br />PUBLIC WORKS - Y. Soto <br />ELECT - M. Smith