Laserfiche WebLink
UP <br />UP <br />R09R10R11R12R13R14R15R16R17 <br />RF <br />RG <br />RH <br />RJ <br />RK <br />RL <br />R08R11' <br />ACCU <br />R01 <br />ACCU <br />R03C <br />FOR REFERENCE ONLY <br />1. THIS SHEET IS "FOR REFRENCE ONLY". <br />2. THIS SHEET SHOWS THE LOCATION OF AIR COOLED CONDENSING UNITS (ACCU) <br />FOR INDOOR UNITS PERTAINING TO INTERIORS PACKAGE ONLY. <br />3. ALL CONDENSING UNITS AND ASSOCIATED REFRIGERANT PIPING TO RESPECTIVE <br />BRANCK CIRCUIT CONTROLLERS (BCC) ARE PART OF CORE & SHELL SCOPE AND <br />NOT IN SCOPE FOR INTERIORS PACKAGE. <br />4. REFER TO CORE & SHELL MECHANICAL DRAWINGS FOR MORE DETAILS. <br />SHEET NOTES GENERAL NOTES KEY PLAN <br />© Gensler <br />Date Description <br />Project Name <br />Project Number <br />Description <br />Scale <br />Seal / Signature <br />2021 <br />Tel 949.863.9434 <br />Fax 949-553-1676 <br />4675 MacArthur Court <br />Suite 100 <br />Newport Beach, CA <br />92600 <br />USA <br />EXP: 12/31/2025 <br />As indicated <br />6/12/2024 7:43:16 AM <br />BIM 360://007.3757.000 - Caribou Industries - 3rd & Broadway/228011-04_3RD-B_MECH_R20.rvt <br />R2.M4.102 <br />REFRIGERANT PIPING PLAN - LEVEL <br />02 <br />228011-04 <br />3rd & Broadway Residential <br />Tower Tenant Interiors <br />1103 North Broadway <br />Santa Ana, CA 92701 <br />SCALE:1/8" = 1'-0" <br />REFRIGERANT PIPING PLAN - LEVEL 021 <br />1 <br />06.13.2022 ISSUE FOR PLAN CHECK <br />1 06.17.2024 REVISION TO PERMIT <br />1/15/2025