Laserfiche WebLink
09 30 00.A00 <br />CERAMIC TILE <br />09 29 00.C04 <br />GLASS-MAT, W-R BACKING BD <br />SCHEDULED PARTITION09 30 00.G01 <br />THINSET MORTAR <br />CONTINOUS EPS PREFORMED SHOWER BASE <br />SLOPED TO DRAIN EXTEND UP WALL AND <br />EXTEND TO DRAIN CLAMP RING, BASIS OF <br />DESIGN KBRS READY TO TILE SHOWER BASE <br />07 92 00.A00 <br />JOINT SEALANT <br />1/ <br />8 <br />" <br />09 30 00.A00 <br />CERAMIC TILE <br />09 30 00.H00 <br />GROUT <br />ON THINSET OVER <br />SLOPE <br />1/8":1'-0" <br />07 92 00.A00 <br />JOINT SEALANT <br />SCHEDULED DRAIN, REFER TO PLUMBING DWGS <br />6" <br />09 30 00.I02 <br />WATERPROOF MEMBRANE <br />CONTINOUS FROM WALL TO FLOOR UNDER SHOWER BASE <br />(2) LAYERS OF 1/4" WONDERBOARD OVER 6" METAL BACKING <br />ASSEMBLY: <br />1. NORTH WALL COVERED <br />BY 5/8" FIRE RATED <br />DRYWALL BY BASE <br />BUILDING CONTRACTOR. <br />2. 6" BACKING IS <br />INSTALLED AT THE TOP <br />OF THE SHOWER PAN AT <br />THE EAST AND WEST <br />PERIMETER PER LADBS <br />INSPECTION. <br />3. WATERPROOFING IS <br />LAYERED UP THE SIDES <br />OF BASE BUILDING 5/8" <br />FIRE RATED DRYWALL <br />COMPLETE TO CEILING <br />PER LADBS INSPECTION. <br />4. 1 QUANTITY LAYER OF <br />1/4" WONDERBOARD <br />INSTALLED OVER FIRST <br />LAYER OF <br />WATERPOOFING. <br />5. WATERPROOFING <br />INSTALLED OVER THE 1/4" <br />WONDERBOARD AND ALL <br />WALLS. <br />6. 48 HOUR WATER TEST <br />PERFORMED AS PER <br />CONTRACT <br />SPECIFICATIONS. <br />09 30 00.A00 <br />CERAMIC TILE <br />09 29 00.C04 <br />GLASS-MAT, W-R BACKING BD <br />09 29 00.C02 <br />WATER-RESIS GYP BD 5/8" <br />SCHEDULED PARTITION <br />09 30 00.I02 <br />WATERPROOF MEMBRANE <br />09 30 00.G01 <br />THINSET MORTAR <br />CONTINOUS FLOOR TO WALL TO CEILING <br />GYPSUM BOARD CEILING ASSEMBLY <br />WITH FRAMING AT 16" OC MAX <br />07 92 00.A00 <br />JOINT SEALANT <br />1/ <br />8 <br />" <br />1/ <br />4 <br />" <br />09 30 00.H00 <br />GROUT <br />09 30 00.A00 <br />CERAMIC TILE <br />09 29 00.C04 <br />GLASS-MAT, W-R BACKING BD <br />SCHEDULED PARTITION <br />09 30 00.G01 <br />THINSET MORTAR <br />1/ <br />8 <br />" <br />09 30 00.A00 <br />CERAMIC TILE <br />09 30 00.H00 <br />GROUT <br />ON THINSET OVER <br />07 92 00.A00 <br />JOINT SEALANT <br />09 30 00.I02 <br />WATERPROOF MEMBRANE <br />SCHLUTER DILEX AHK <br />BRUSHED GRAPHITE COVE <br />07 92 00.A00 <br />JOINT SEALANT <br />R 3/8" <br />WATERPROOFING <br />06 54 13.A01 <br />FLOOR SOUND MAT <br />AS INDICATED ON INTERIOR ELEVATIONS <br />SOLID SURFACE <br />COUNTERTOP <br />1 1/2" <br />3/4" <br />2 EQ. DRAWERS <br />4"3" <br />3/4" <br />VESSEL LAVATORY <br />SOLID WOOD <br />DRAWER <br />MIRROR <br />SOLID SURFACE BACK SPLASH <br />SOLID SURFACE <br />COUNTERTOP <br />2 EQ. DRAWERS <br />4"3" <br />3/4" <br />UNDERCOUNTER <br />SINK <br />SOLID WOOD <br />DRAWER <br />MIRROR <br />SOLID SURFACE BACK SPLASH <br />3/4" <br />1 1/2" <br />09 30 00.G01 <br />THINSET MORTAR <br />SCHEDULED WALL TILE <br />09 29 00.C04 <br />GLASS-MAT, W-R BACKING BD <br />SCHEDULED PARTITION <br />20GA MIN. METAL <br />STUD FRAMING <br />SCHEDULED DROP-IN BATHTUB INSIDE CORNER COVE <br />09 29 00.C04 <br />GLASS-MAT, W-R BACKING BD <br />09 30 00.G01 <br />THINSET MORTAR <br />SCHEDULED WALL TILE <br />09 30 00.H00 <br />GROUT <br />BEAD OF SILICONE SEALANT ALONG THE SEAMS, TYP. <br />WATERPROOFING, TYP. <br />WATERPROOFING, TYP. <br />SCHEDULED DROP-IN <br />BATHTUB <br />GROUT, TYP. <br />SCHEDULED TILE <br />THINSET MORTAR, TYP. <br />W.R. BACKING BOARD, TYP. <br />20GA MIN. METAL STUD FRAMING <br />SCHEDULED COVE BASE <br />JOINT SEALANT, TYP. <br />SCHEDULED FLOOR TILE <br />OVER THINSET <br />WATERPROOFING, TYP. <br />WATERPROOFING, TYP. <br />SOUND MAT, TYP. <br />RE <br />F <br />E <br />R <br /> <br />T <br />O <br /> <br />I <br />N <br />T <br />. <br /> <br />E <br />L <br />E <br />V <br />S <br />. <br />2"X2" STEEL TUBE <br />WELDED TO 3 5/8" X 16 <br />GA. METAL STUDS <br />P-LAM PANEL <br />29 <br />" <br /> <br />M <br />I <br />N <br />9" MIN. <br />1 <br />1 <br />/ <br />2 <br />" <br />REFER TO INTERIOR <br />ELEVATIONS FOR BACK <br />SPLASH <br />SOLID SURFACE ON <br />PLYWOOD SUBSTRATE <br />FINISH FLOOR <br />REMOVEABLE <br />P-LAM PANEL <br />© Gensler <br />Date Description <br />Project Name <br />Project Number <br />Description <br />Scale <br />Seal / Signature <br />2021 <br />Tel 949.863.9434 <br />Fax 949-553-1676 <br />4675 MacArthur Court <br />Suite 100 <br />Newport Beach, CA <br />92600 <br />USA <br />As indicated <br />9/23/2024 2:54:16 PM <br />BIM 360://007.3757.000 - Caribou Industries - 3rd & Broadway/3RD-B_INTERIOR_WEST_R20.rvt <br />R2.I6.401 <br />RESTROOM DETAILS <br />07.3897.000 <br />3rd & Broadway Interior <br />301 N. Broadway, Santa Ana, CA <br />SCALE:6" = 1'-0" <br />RESTROOM FLOOR/SHOWER DRAIN DETAIL03 <br />SCALE:6" = 1'-0" <br />TILE TO RESTROOM CEILING02 <br />SCALE:6" = 1'-0" <br />RESTROOM COVE DETAIL04 <br />SCALE:1 1/2" = 1'-0" <br />COUNTERTOP W/ VESSEL LAV01SCALE:1 1/2" = 1'-0" <br />COUNTERTOP W/ 2 DRAWERS05 <br />06.13.2022 ISSUE FOR PLAN CHECK <br />A 08.10.2022 REISSUE FOR PLAN CHECK <br />C 06.17.2024 REVISION TO PERMIT <br />SCALE:6" = 1'-0" <br />BATHTUB DETAIL-108SCALE:6" = 1'-0" <br />BATHTUB DETAIL-212 <br />SCALE:1 1/2" = 1'-0" <br />ACCESSIBLE LAVATORY06 <br />C <br />C <br />C <br />11/12/2024