My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />CONSTRUCTION PROGRESS DOCUMENTATION 01 3200 - 4 <br />ed. 2023-09-22 <br />e.Fabrication. <br />f.Sample testing. <br />g.Deliveries. <br />h.Installation. <br />i.Tests and inspections. <br />j.Adjusting. <br />k.Curing. <br />l.Building flush-out. <br />m.Startup and placement into final use and operation. <br />5.Construction Areas: Identify each major area of construction for each major portion of the <br />Work. Indicate where each construction activity within a major area must be sequenced or <br />integrated with other construction activities to provide for the following: <br />a.Structural completion. <br />b.Temporary enclosure and space conditioning. <br />c.Permanent space enclosure. <br />d.Completion of mechanical installation. <br />e.Completion of electrical installation. <br />f.Substantial Completion. <br />6.Other Constraints: Requirements by Mall listed in Tenant Handbook. <br />D.Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not <br />limited to, the Notice to Proceed, Substantial Completion, and final completion, and the following <br />interim milestones: <br />1.Exterior wall and roof enclosure. <br />2.Concrete slab work complete. <br />3.Temporary space conditioning. <br />E.Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or <br />commence prior to submittal of next schedule update. Summarize the following issues: <br />1.Unresolved issues. <br />2.Unanswered Requests for Information. <br />3.Rejected or unreturned submittals. <br />4.Notations on returned submittals. <br />5.Pending modifications affecting the Work and the Contract Time. <br />F.Contractor's Construction Schedule Updating: At bi-weekly intervals, update schedule to reflect actual <br />construction progress and activities. Issue schedule one week before each regularly scheduled <br />progress meeting. <br />1.Revise schedule immediately after each meeting or other activity where revisions have been <br />recognized or made. Issue updated schedule concurrently with the report of each such meeting.
The URL can be used to link to this page
Your browser does not support the video tag.