Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />CONSTRUCTION PROGRESS DOCUMENTATION 01 3200 - 4 <br />ed. 2023-09-22 <br />e.Fabrication. <br />f.Sample testing. <br />g.Deliveries. <br />h.Installation. <br />i.Tests and inspections. <br />j.Adjusting. <br />k.Curing. <br />l.Building flush-out. <br />m.Startup and placement into final use and operation. <br />5.Construction Areas: Identify each major area of construction for each major portion of the <br />Work. Indicate where each construction activity within a major area must be sequenced or <br />integrated with other construction activities to provide for the following: <br />a.Structural completion. <br />b.Temporary enclosure and space conditioning. <br />c.Permanent space enclosure. <br />d.Completion of mechanical installation. <br />e.Completion of electrical installation. <br />f.Substantial Completion. <br />6.Other Constraints: Requirements by Mall listed in Tenant Handbook. <br />D.Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not <br />limited to, the Notice to Proceed, Substantial Completion, and final completion, and the following <br />interim milestones: <br />1.Exterior wall and roof enclosure. <br />2.Concrete slab work complete. <br />3.Temporary space conditioning. <br />E.Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or <br />commence prior to submittal of next schedule update. Summarize the following issues: <br />1.Unresolved issues. <br />2.Unanswered Requests for Information. <br />3.Rejected or unreturned submittals. <br />4.Notations on returned submittals. <br />5.Pending modifications affecting the Work and the Contract Time. <br />F.Contractor's Construction Schedule Updating: At bi-weekly intervals, update schedule to reflect actual <br />construction progress and activities. Issue schedule one week before each regularly scheduled <br />progress meeting. <br />1.Revise schedule immediately after each meeting or other activity where revisions have been <br />recognized or made. Issue updated schedule concurrently with the report of each such meeting.