My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />TEMPORARY FACILITIES AND CONTROLS 01 5000 - 1 <br />ed. 2023-09-22 <br />SECTION 01 5000 - TEMPORARY FACILITIES AND CONTROLS <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract, including General and Supplementary Conditions and other <br />Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A.Section includes requirements for temporary utilities, support facilities, and security and protection facilities. <br />B.Related Requirements: <br />1.Section 01 1000 "Summary" for work restrictions and limitations on utility interruptions. <br />1.3 USE CHARGES <br />A.General: Installation and removal of and use charges for temporary facilities shall be included in the Contract Sum <br />unless otherwise indicated. Allow other entities engaged in the Project to use temporary services and facilities <br />without cost, including, but not limited to, Tenant’s construction forces, Architect, testing agencies, and <br />authorities having jurisdiction. <br />B.Sewer Service: Arrange and Pay sewer-service use charges for sewer usage by all entities for construction <br />operations with Mall Management. <br />C.Water Service: Arrange and Pay water-service use charges for water used by all entities for construction <br />operations with Mall Management. <br />D.Electric Power Service: Pay electric-power-service use charges for electricity used by all entities for construction <br />operations. <br />1.4 INFORMATIONAL SUBMITTALS <br />A.Site Utilization Plan: Show temporary facilities, temporary utility lines and connections, staging areas, <br />construction site entrances, vehicle circulation, and parking areas for construction personnel. <br />B.Implementation and Termination Schedule: Within fifteen (15) days of date established for commencement of the <br />Work, submit schedule indicating implementation and termination dates of each temporary utility.
The URL can be used to link to this page
Your browser does not support the video tag.