Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />TEMPORARY FACILITIES AND CONTROLS 01 5000 - 4 <br />ed. 2023-09-22 <br />1.Use of gasoline-burning space heaters, open-flame heaters, or salamander-type heating units is prohibited. <br />2.Heating Units: Listed and labeled for type of fuel being consumed, by a qualified testing agency <br />acceptable to authorities having jurisdiction, and marked for intended location and application. <br />3.Permanent HVAC System: If Landlord or Owner authorizes use of permanent HVAC system for <br />temporary use during construction, provide filter with MERV of 9 at each return-air grille in system and <br />remove at end of construction and clean HVAC system as required in Section 01 7700 "Closeout <br />Procedures." <br />C.Air-Filtration Units: Primary and secondary HEPA-filter-equipped portable units with four-stage filtration. <br />Provide single switch for emergency shutoff. Configure to run continuously. <br />PART 3 - EXECUTION <br />3.1 TEMPORARY FACILITIES, GENERAL <br />A.Conservation: Coordinate construction and use of temporary facilities with consideration given to conservation of <br />energy, water, and materials. Coordinate use of temporary utilities to minimize waste. <br />1.Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work. <br />See other Sections for disposition of salvaged materials that are designated as Owner's property. <br />3.2 INSTALLATION, GENERAL <br />A.Locate facilities where they will serve Project adequately and result in minimum interference with performance of <br />the Work. Relocate and modify facilities as required by progress of the Work. <br />1.Locate facilities to limit site disturbance as specified in Section 01 1000 "Summary." <br />B.Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer <br />needed or are replaced by authorized use of completed permanent facilities. <br />3.3 TEMPORARY UTILITY INSTALLATION <br />A.General: Install temporary service or connect to existing service. <br />1.Arrange with utility company, Owner, and existing users for time when service can be interrupted, if <br />necessary, to make connections for temporary services. <br />B.Sewers and Drainage: Provide temporary utilities to remove effluent lawfully.