My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />EXECUTION REQUIREMENTS 01 7300 - 4 <br />ed. 2023-09-22 <br />other construction, verify dimensions of other construction by field measurements before fabrication. <br />Coordinate fabrication schedule with construction progress to avoid delaying the Work. <br />C.Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on <br />Drawings. <br />D.Review of Contract Documents and Field Conditions: Immediately on discovery of the need for <br />clarification of the Contract Documents caused by differing field conditions outside the control of <br />Contractor, submit a request for information to Architect according to requirements in Section 01 3100 <br />"Project Management and Coordination." <br />3.3 CONSTRUCTION LAYOUT <br />A.Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in <br />relation to the property survey and existing benchmarks. If discrepancies are discovered, notify <br />Architect promptly. <br />B.Building Lines and Levels: Locate and lay out control lines and levels for structures, building <br />foundations, column grids, and floor levels, including those required for mechanical and electrical work. <br />C.Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. <br />Include beginning and ending dates and times of surveys, weather conditions, name and duty of each <br />survey party member, and types of instruments and tapes used. Make the log available for reference by <br />Architect. <br />3.4 INSTALLATION <br />A.General: Locate the Work and components of the Work accurately, in correct alignment and elevation, <br />as indicated. <br />1.Make vertical work plumb and make horizontal work level. <br />2.Where space is limited, install components to maximize space available for maintenance and ease <br />of removal for replacement. <br />3.Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated. <br />4.Maintain minimum headroom clearance of 96 inches in occupied spaces and 90 inches in <br />unoccupied spaces. <br />B.Comply with manufacturer's written instructions and recommendations for installing products in <br />applications indicated. <br />C.Install products at the time and under conditions that will ensure the best possible results. Maintain <br />conditions required for product performance until Substantial Completion. <br />D.Conduct construction operations so no part of the Work is subjected to damaging operations or loading <br />in excess of that expected during normal conditions of occupancy.
The URL can be used to link to this page
Your browser does not support the video tag.