Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />EXECUTION REQUIREMENTS 01 7300 - 4 <br />ed. 2023-09-22 <br />other construction, verify dimensions of other construction by field measurements before fabrication. <br />Coordinate fabrication schedule with construction progress to avoid delaying the Work. <br />C.Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on <br />Drawings. <br />D.Review of Contract Documents and Field Conditions: Immediately on discovery of the need for <br />clarification of the Contract Documents caused by differing field conditions outside the control of <br />Contractor, submit a request for information to Architect according to requirements in Section 01 3100 <br />"Project Management and Coordination." <br />3.3 CONSTRUCTION LAYOUT <br />A.Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in <br />relation to the property survey and existing benchmarks. If discrepancies are discovered, notify <br />Architect promptly. <br />B.Building Lines and Levels: Locate and lay out control lines and levels for structures, building <br />foundations, column grids, and floor levels, including those required for mechanical and electrical work. <br />C.Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. <br />Include beginning and ending dates and times of surveys, weather conditions, name and duty of each <br />survey party member, and types of instruments and tapes used. Make the log available for reference by <br />Architect. <br />3.4 INSTALLATION <br />A.General: Locate the Work and components of the Work accurately, in correct alignment and elevation, <br />as indicated. <br />1.Make vertical work plumb and make horizontal work level. <br />2.Where space is limited, install components to maximize space available for maintenance and ease <br />of removal for replacement. <br />3.Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated. <br />4.Maintain minimum headroom clearance of 96 inches in occupied spaces and 90 inches in <br />unoccupied spaces. <br />B.Comply with manufacturer's written instructions and recommendations for installing products in <br />applications indicated. <br />C.Install products at the time and under conditions that will ensure the best possible results. Maintain <br />conditions required for product performance until Substantial Completion. <br />D.Conduct construction operations so no part of the Work is subjected to damaging operations or loading <br />in excess of that expected during normal conditions of occupancy.