Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />CLOSEOUT PROCEDURES 01 7700 - 3 <br />ed. 2023-09-22 <br />6.Advise Owner of changeover in utility services. <br />7.Participate with Owner in conducting inspection and walkthrough with local emergency <br />responders. <br />8.Terminate and remove temporary facilities from Project site, along with mockups, construction <br />tools, and similar elements. <br />9.Complete final cleaning requirements. <br />10.Touch up paint and otherwise repair and restore marred exposed finishes to eliminate visual <br />defects. <br />D.Inspection: Submit a written request for inspection to determine Substantial Completion a minimum of <br />ten (10) days prior to date the Work will be completed and ready for final inspection and tests. On <br />receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled <br />requirements. Architect will prepare the Certificate of Substantial Completion after inspection or will <br />notify Contractor of items, either on Contractor's list or additional items identified by Architect, that <br />must be completed or corrected before certificate will be issued. <br />1.Request reinspection when the Work identified in previous inspections as incomplete is <br />completed or corrected. <br />2.Results of completed inspection will form the basis of requirements for final completion. <br />1.7 FINAL COMPLETION PROCEDURES <br />A.Submittals Prior to Final Completion: Before requesting final inspection for determining final <br />completion, complete the following: <br />1.Submit a final Application for Payment according to Section 01 2900 "Payment Procedures." <br />2.Certified List of Incomplete Items: Submit certified copy of Architect's Substantial Completion <br />inspection list of items to be completed or corrected (punch list), endorsed and dated by <br />Architect. Certified copy of the list shall state that each item has been completed or otherwise <br />resolved for acceptance. <br />3.Certificate of Insurance: Submit evidence of final, continuing insurance coverage complying <br />with insurance requirements. <br />4.Submit pest-control final inspection report. <br />5.Submit final completion photographic documentation. <br />B.Inspection: Submit a written request for final inspection to determine acceptance a minimum of 10 days <br />prior to date the work will be completed and ready for final inspection and tests. On receipt of request, <br />Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect <br />will prepare a final Certificate for Payment after inspection or will notify Contractor of construction <br />that must be completed or corrected before certificate will be issued. <br />1.Request reinspection when the Work identified in previous inspections as incomplete is <br />completed or corrected.