Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />CLOSEOUT PROCEDURES 01 7700 - 6 <br />ed. 2023-09-22 <br />f.Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of <br />stains, films, and similar foreign substances. Avoid disturbing natural weathering of <br />exterior surfaces. Restore reflective surfaces to their original condition. <br />g.Remove debris and surface dust from limited access spaces, including roofs, plenums, <br />shafts, trenches, equipment vaults, manholes, attics, and similar spaces. <br />h.Sweep concrete floors broom clean in unoccupied spaces. <br />i.Vacuum carpet and similar soft surfaces, removing debris and excess nap; clean <br />according to manufacturer's recommendations if visible soil or stains remain. <br />j.Clean transparent materials, including mirrors and glass in doors and windows. Remove <br />glazing compounds and other noticeable, vision-obscuring materials. Polish mirrors and <br />glass, taking care not to scratch surfaces. <br />k.Remove labels that are not permanent. <br />l.Wipe surfaces of mechanical and electrical equipment and similar equipment. Remove <br />excess lubrication, paint and mortar droppings, and other foreign substances. <br />m.Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting <br />from water exposure. <br />n.Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of <br />diffusers, registers, and grills. <br />o.Clean ducts, blowers, and coils if units were operated without filters during construction <br />or that display contamination with particulate matter on inspection. <br />1)Clean HVAC system in compliance with NADCA ACR. Provide written report on <br />completion of cleaning. <br />p.Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. <br />q.Leave Project clean and ready for occupancy. <br />C.Pest Control: Comply with pest control requirements in Section 01 5000 "Temporary Facilities and <br />Controls." Prepare written report. <br />D.Construction Waste Disposal: Comply with waste disposal requirements in Section 01 7419 <br />"Construction Waste Management and Disposal.” <br />3.2 REPAIR OF THE WORK <br />A.Complete repair and restoration operations before requesting inspection for determination of <br />Substantial Completion. <br />B.Repair, or remove and replace, defective construction. Repairing includes replacing defective parts, <br />refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating <br />equipment. Where damaged or worn items cannot be repaired or restored, provide replacements. <br />Remove and replace operating components that cannot be repaired. Restore damaged construction and <br />permanent facilities used during construction to specified condition.