My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />OPERATION AND MAINTENANCE DATA 01 7823 - 5 <br />ed. 2023-09-22 <br />1.8 SYSTEMS AND EQUIPMENT OPERATION MANUALS <br />A.Systems and Equipment Operation Manual: Assemble a complete set of data indicating operation of each <br />system, subsystem, and piece of equipment not part of a system. Include information required for daily <br />operation and management, operating standards, and routine and special operating procedures. <br />1.Engage a factory-authorized service representative to assemble and prepare information for each <br />system, subsystem, and piece of equipment not part of a system. <br />2.Prepare a separate manual for each system and subsystem, in the form of an instructional manual <br />for use by Owner's operating personnel. <br />B.Content: In addition to requirements in this Section, include operation data required in individual <br />Specification Sections and the following information: <br />1.System, subsystem, and equipment descriptions. Use designations for systems and equipment <br />indicated on Contract Documents. <br />2.Performance and design criteria if Contractor has delegated design responsibility. <br />3.Operating standards. <br />4.Operating procedures. <br />5.Operating logs. <br />6.Wiring diagrams. <br />7.Control diagrams. <br />8.Piped system diagrams. <br />9.Precautions against improper use. <br />10.License requirements including inspection and renewal dates. <br />C.Descriptions: Include the following: <br />1.Product name and model number. Use designations for products indicated on Contract Documents. <br />2.Manufacturer's name. <br />3.Equipment identification with serial number of each component. <br />4.Equipment function. <br />5.Operating characteristics. <br />6.Limiting conditions. <br />7.Performance curves. <br />8.Engineering data and tests. <br />9.Complete nomenclature and number of replacement parts. <br />D.Operating Procedures: Include the following, as applicable: <br />1.Startup procedures. <br />2.Equipment or system break-in procedures. <br />3.Routine and normal operating instructions. <br />4.Regulation and control procedures. <br />5.Instructions on stopping. <br />6.Normal shutdown instructions. <br />7.Seasonal and weekend operating instructions.
The URL can be used to link to this page
Your browser does not support the video tag.