My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />COLD-FORMED METAL FRAMING 05 4000 - 1 <br />Note that the Round 1 Project Specifications is non-site specific and not all portions of the individual Sections <br />contained in the Project Specifications may apply to a particular Project. Refer to the Drawings. <br />SECTION 05 4000 - COLD-FORMED METAL FRAMING <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1.Load-bearing wall framing. <br />2.Exterior non-load-bearing wall framing. <br />3.Interior non-load-bearing wall framing. <br />4.Floor joist framing. <br />5.Ceiling joist framing. <br />6.Soffit framing. <br />B.Related Requirements: <br />1.Section 05 5000 "Metal Fabrications" for miscellaneous steel shapes, masonry shelf angles, and <br />connections used with cold-formed metal framing. <br />2.Section 09 2216 "Non-Structural Metal Framing" for standard, interior non-load-bearing, metal-stud <br />framing, with height limitations and ceiling-suspension assemblies. <br />1.2 PREINSTALLATION MEETINGS <br />A.Preinstallation Conference: Conduct conference at Project site. <br />1.3 ACTION SUBMITTALS <br />A.Product Data: For the following: <br />1.Cold-formed steel framing materials. <br />2.Load-bearing wall framing. <br />3.Exterior non-load-bearing wall framing. <br />4.Interior non-load-bearing wall framing. <br />5.Vertical deflection clips. <br />6.Double deflection track. <br />7.Drift clips. <br />8.Floor joist framing. <br />9.Ceiling joist framing. <br />10.Soffit framing. <br />11.Post-installed anchors.
The URL can be used to link to this page
Your browser does not support the video tag.