Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />ROUGH CARPENTRY 06 1000 - 5 <br />D. For blocking and nailers used for attachment of other construction, select and cut lumber to <br />eliminate knots and other defects that will interfere with attachment of other work. <br />E. For furring strips for installing plywood or hardboard paneling, select boards with no knots <br />capable of producing bent-over nails and damage to paneling. <br />2.5 PLYWOOD BACKING PANELS <br />A. Equipment Backing Panels: Plywood, DOC PS 1, Exposure 1, C-D Plugged, fire-retardant <br />treated, in thickness indicated or, if not indicated, not less than 1/2-inch nominal thickness. <br />2.6 FASTENERS <br />A. General: Fasteners shall be of size and type indicated and shall comply with requirements <br />specified in this article for material and manufacture. <br />1. Where rough carpentry is exposed to weather, in ground contact, pressure-preservative <br />treated, or in area of high relative humidity, provide fasteners with hot-dip zinc coating <br />complying with ASTM A 153/A 153M. <br />B. Nails, Brads, and Staples: ASTM F 1667. <br />C. Power-Driven Fasteners: Fastener systems with an evaluation report acceptable to authorities <br />having jurisdiction, based on ICC-ES AC70. <br />D. Post-Installed Anchors: Fastener systems with an evaluation report acceptable to authorities <br />having jurisdiction, as appropriate for the substrate. <br />PART 3 - EXECUTION <br />3.1 INSTALLATION, GENERAL <br />A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. <br />Fit rough carpentry accurately to other construction. Locate furring, nailers, blocking, <br />grounds, and similar supports to comply with requirements for attaching other construction. <br />B. Install plywood backing panels by fastening to studs; coordinate locations with utilities requiring <br />backing panels. Install fire-retardant-treated plywood backing panels with classification marking <br />of testing agency exposed to view. <br />C. Install metal framing anchors to comply with manufacturer's written instructions. Install fasteners <br />through each fastener hole. <br />D. Install sill sealer gasket to form continuous seal between sill plates and foundation walls. <br />E. Do not splice structural members between supports unless otherwise indicated.