My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />INTERIOR FINISH CARPENTRY 06 2023 - 2 <br />2.Include data for fire-retardant treatment from chemical-treatment manufacturer and <br />certification by treating plant that treated materials comply with requirements. <br />3.For products receiving a waterborne treatment, include statement that moisture content of <br />treated materials was reduced before shipment to Project site to levels specified. <br />1.5 INFORMATIONAL SUBMITTALS <br />A.Evaluation Reports: For fire-retardant-treated wood, from ICC-ES. <br />B.Sample Warranty: For manufacturer's warranty. <br />1.6 QUALITY ASSURANCE <br />A.Installer Qualifications: Arrange for installation of finish carpentry by a firm that can demonstrate <br />successful experience in installing finish carpentry items similar in type and quality to those required <br />for this Project. <br />1.7 DELIVERY, STORAGE, AND HANDLING <br />A.Stack lumber, plywood, and other panels flat with spacers between each bundle to provide air <br />circulation. Protect materials from weather by covering with waterproof sheeting, securely anchored. <br />Provide for air circulation around stacks and under coverings. <br />B.Deliver interior finish carpentry materials only when environmental conditions comply with <br />requirements specified for installation areas. If interior finish carpentry materials must be stored in <br />other than installation areas, store only where environmental conditions comply with requirements <br />specified for installation areas. <br />1.8 FIELD CONDITIONS <br />A.Environmental Limitations: Do not deliver or install interior finish carpentry materials until building <br />is enclosed and weatherproof, wet work in space is completed and nominally dry, and HVAC system <br />is operating and maintaining temperature and relative humidity at occupancy levels during the <br />remainder of the construction period. <br />B.Do not install finish carpentry materials that are wet, moisture damaged, or mold damaged. <br />1.Indications that materials are wet or moisture damaged include, but are not limited to, <br />discoloration, sagging, or irregular shape. <br />2.Indications that materials are mold damaged include, but are not limited to, fuzzy or splotchy <br />surface contamination and discoloration.
The URL can be used to link to this page
Your browser does not support the video tag.