My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />INTERIOR FINISH CARPENTRY 06 2023 - 7 <br />miter at outside corners, and cope at inside corners to produce tight-fitting joints with full-surface <br />contact throughout length of joint. Use scarf joints for end-to-end joints. Plane backs of casings to <br />provide uniform thickness across joints where necessary for alignment. <br />1.Match color and grain pattern of trim across joints. <br />2.Install trim after gypsum-board joint finishing operations are completed. <br />3.Install without splitting; drill pilot holes before fastening where necessary to prevent splitting. <br />Fasten to prevent movement or warping. Countersink fastener heads on exposed carpentry <br />work and fill holes. <br />3.5 PANELING INSTALLATION <br />A.Plank Paneling: Install in accordance with manufacturer's instructions. Arrange in random-width <br />pattern suggested by manufacturer, unless boards or planks are of uniform width. Stagger end joints in <br />random pattern to uniformly distribute joints on each wall. Install with uniform joints with only <br />tongue-and-groove joints or end-matched joints within each field of paneling. <br />1.Select and arrange panels on each wall for best match of adjacent panels for paneling where <br />grain character or color variations are noticeable. Install with uniform tight joints between <br />panels. <br />2.Fasten paneling to substrate complying with manufacturer's recommendations for concealed <br />nailing. <br />3.Fasten paneling to wood substrate using manufacturer's concealed clip system. <br />4.Fasten paneling to gypsum wallboard substrates using adhesive. <br />3.6 High Density Polyethylene Floor Base, Wall Guards, Edge Banding and Trim: Use finish gun nails <br />for installation of all HDPE and provide butt joints (not miter joints) at all corner conditions. <br />3.7 ADJUSTING <br />A.Replace interior finish carpentry that is damaged or does not comply with requirements. Interior finish <br />carpentry may be repaired or refinished if work complies with requirements and shows no evidence of <br />repair or refinishing. Adjust joinery for uniform appearance. <br />3.8 CLEANING <br />A.Clean interior finish carpentry on exposed and semiexposed surfaces. Restore damaged or soiled areas <br />and touch up factory-applied finishes if any. <br />3.9 PROTECTION <br />A.Protect installed products from damage from weather and other causes during construction.
The URL can be used to link to this page
Your browser does not support the video tag.