Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08 4113 - 1 <br />ed. 2024-02-20 <br />Note that the Round 1 Project Specifications is non-site specific and not all portions of the individual <br />Sections contained in the Project Specifications may apply to a particular Project. Refer to the Drawings. <br />SECTION 08 4113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1.Aluminum-framed entrance and storefront systems. <br />1.2 ACTION SUBMITTALS <br />A.Product Data: <br />1.Aluminum-framed entrance and storefront systems. <br />B.Product Data Submittals: For each product. <br />1.Construction details, material descriptions, dimensions of individual components and profiles, <br />and finishes. <br />2.Operating characteristics, electrical characteristics, and furnished accessories. <br />C.Shop Drawings: <br />1.Plans, elevations, sections, full-size details, and attachments to other work. <br />2.Details of provisions for assembly expansion and contraction and for draining moisture <br />occurring within the assembly to the exterior. <br />3.Full-size isometric details of each type of vertical-to-horizontal intersection of aluminum- <br />framed entrance and storefront systems, showing the following: <br />a.Joinery, including concealed welds. <br />b.Anchorage. <br />c.Expansion provisions. <br />d.Glazing. <br />e.Flashing and drainage. <br />4.Connection to and continuity with adjacent thermal, weather, air, and vapor barriers. <br />5.Point-to-point wiring diagrams showing the following: <br />a.Power requirements for each electrically operated door hardware. <br />b.Location and types of switches, signal device, conduit sizes, and number and size of <br />wires.