Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />DOOR HARDWARE 08 7100-2 <br />ed. 2023-10-12 <br />3. UL 1784 - Air Leakage Tests of Door Assemblies <br />4. UL 305 - Panic Hardware <br />B. DHI - Door and Hardware Institute <br />1. Sequence and Format for the Hardware Schedule <br />2. Recommended Locations for Builders Hardware <br />3. Keying Systems and Nomenclature <br />4. Installation Guide for Doors and Hardware <br />C. NFPA – National Fire Protection Association <br />1. NFPA 80 – 2016 Edition – Standard for Fire Doors and Other Opening Protectives <br />2. NFPA 101 – Life Safety Code <br />3. NFPA 105 – Smoke and Draft Control Door Assemblies <br />4. NFPA 252 – Fire Tests of Door Assemblies <br />D. ANSI - American National Standards Institute <br />1. ANSI A117.1 – 2017 Edition – Accessible and Usable Buildings and Facilities <br />2. ANSI/BHMA A156.1 - A156.29, and ANSI/BHMA A156.31 - Standards for Hardware <br />and Specialties <br />3. ANSI/BHMA A156.28 - Recommended Practices for Keying Systems <br />4. ANSI/WDMA I.S. 1A - Interior Architectural Wood Flush Doors <br />5. ANSI/SDI A250.8 - Standard Steel Doors and Frames <br />E. 2022 California Building Code <br />1. Chapter 11B – Accessibility to Public Buildings, Public Accommodations, Commercial <br />Buildings and Public Housing <br />1.03 SUBMITTALS <br />A. General: <br />1. Submit in accordance with Conditions of Contract and Division 01 Submittal Procedures. <br />2. Prior to forwarding submittal: <br />a. Review drawings and Sections from related trades to verify compatibility with <br />specified hardware. <br />b. Highlight, encircle, or otherwise specifically identify on submittals: deviations from <br />Contract Documents, issues of incompatibility or other issues which may <br />detrimentally affect the Work. <br />B. Action Submittals: