Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />DOOR HARDWARE 08 7100-6 <br />ed. 2023-10-12 <br />1) Function of building, flow of traffic, purpose of each area, degree of security <br />required, and plans for future expansion. <br />2) Preliminary key system schematic diagram. <br />3) Requirements for key control system. <br />4) Address for delivery of keys. <br />2. Pre-installation Conference <br />a. Review and finalize construction schedule and verify availability of materials, <br />Installer's personnel, equipment, and facilities needed to make progress and avoid <br />delays. <br />b. Inspect and discuss preparatory work performed by other trades. <br />c. Review required testing, inspecting, and certifying procedures. <br />d. Review questions or concerns related to proper installation and adjustment of door <br />hardware. <br />1.05 DELIVERY, STORAGE, AND HANDLING <br />A. Inventory door hardware on receipt and provide secure lock-up for hardware delivered to <br />Project site. Promptly replace products damaged during shipping. <br />B. Tag each item or package separately with identification coordinated with final door hardware <br />schedule, and include installation instructions, templates, and necessary fasteners with each <br />item or package. Deliver each article of hardware in manufacturer's original packaging. <br />C. Maintain manufacturer-recommended environmental conditions throughout storage and <br />installation periods. <br />D. Provide secure lock-up for door hardware delivered to Project. Control handling and <br />installation of hardware items so that completion of Work will not be delayed by hardware <br />losses both before and after installation. <br />E. Handle hardware in manner to avoid damage, marring, or scratching. Correct, replace or <br />repair products damaged during Work. Protect products against malfunction due to paint, <br />solvent, cleanser, or any chemical agent. <br />F. Deliver keys to manufacturer of key control system for subsequent delivery to Owner. <br />1.06 COORDINATION <br />A. Coordinate layout and installation of floor-recessed door hardware with floor construction. <br />Cast anchoring inserts into concrete. <br />B. Installation Templates: Distribute for doors, frames, and other work specified to be factory or <br />shop prepared. Check Shop Drawings of other work to confirm that adequate provisions are <br />made for locating and installing door hardware to comply with indicated requirements.