My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />DOOR HARDWARE 08 7100-16 <br />ed. 2023-10-12 <br />N. Stops: Provide floor stops for doors unless wall or other type stops are indicated in door <br />hardware schedule. Do not mount floor stops where they may impede traffic or present <br />tripping hazard. <br />O. Perimeter Gasketing: Apply to head and jamb, forming seal between door and frame. <br />P. Meeting Stile Gasketing: Fasten to meeting stiles, forming seal when doors are closed. <br />Q. Door Bottoms and Sweeps: Apply to bottom of door, forming seal with threshold when door <br />is closed. <br />3.03 ADJUSTING <br />A. Initial Adjustment: Adjust and check each operating item of door hardware and each door to <br />ensure proper operation or function of every unit. Replace units that cannot be adjusted to <br />operate as intended. Adjust door control devices to compensate for final operation of heating <br />and ventilating equipment and to comply with referenced accessibility requirements. <br />1. Spring Hinges: Adjust to achieve positive latching when door can close freely from an <br />open position of 30 degrees. <br />2. Door Closers: Adjust sweep period to comply with accessibility requirements and <br />requirements of authorities having jurisdiction. <br />B. Occupancy Adjustment: Approximately three to six months after date of Substantial <br />Completion, examine and readjust each item of door hardware, including adjusting operating <br />forces, as necessary to ensure function of doors and door hardware. <br />3.04 CLEANING AND PROTECTION <br />A. Clean adjacent surfaces soiled by door hardware installation. <br />B. Clean operating items per manufacturer's instructions to restore proper function and finish. <br />C. Provide final protection and maintain conditions that ensure door hardware is without damage <br />or deterioration at time of Substantial Completion. <br />3.05 DOOR HARDWARE SCHEDULE <br />A. The intent of the hardware specification is to specify the hardware for interior and exterior <br />doors, and to establish a type, continuity, and standard of quality. However, it is the door <br />hardware supplier's responsibility to thoroughly review existing conditions, schedules, <br />specifications, drawings, and other Contract Documents to verify the suitability of the <br />hardware specified.
The URL can be used to link to this page
Your browser does not support the video tag.