My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />SHEET CARPETING 09 6816 - 1 <br />Note that the Round 1 Project Specifications is non-site specific and not all portions of the individual <br />Sections contained in the Project Specifications may apply to a particular Project. Refer to the Drawings. <br />SECTION 09 6816 - SHEET CARPETING <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract, including General and Supplementary Conditions <br />and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A.Section Includes: <br />1.Sheet carpet. <br />B.Related Requirements: <br />1.Section 01 1000 “Summary”, for Owner Supplied Products. <br />2.Section 09 6513 "Resilient Base and Accessories" for resilient wall base and accessories <br />installed with carpet. <br />3.Section 09 6519 "Resilient Tile Flooring". <br />1.3 PREINSTALLATION MEETINGS <br />A.Preinstallation Conference: Conduct conference at Project site. <br />1.Review methods and procedures related to carpet installation including, but not limited to, the <br />following: <br />a.Review delivery, storage, and handling procedures. <br />b.Review ambient conditions and ventilation procedures. <br />c.Review subfloor preparation procedures. <br />1.4 ACTION SUBMITTALS <br />A.Product Data: For each type of product. <br />1.Include manufacturer's written data on physical characteristics and durability. <br />2.Include manufacturer's written installation recommendations for each type of substrate. <br />B.Shop Drawings: For carpet installation, showing the following:
The URL can be used to link to this page
Your browser does not support the video tag.