My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Import Agent
Created:
2/13/2026 5:01 AM
Modified:
2/12/2026 9:52 AM
Text:
http://www.specagent.com/Lookup?ulid=9192
ID:
2
Creator:
Import Agent
Created:
2/13/2026 5:01 AM
Modified:
2/12/2026 9:52 AM
Text:
http://www.specagent.com/Lookup?uid=123457010305
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />WALL COVERINGS 09 7200 - 2 <br />ed. 2023-10-20 <br />B.Product Test Reports: For each wall covering, for tests performed by a qualified testing agency. <br />1.6 FIELD CONDITIONS <br />A.Environmental Limitations: Do not deliver or install wall coverings until spaces are enclosed and <br />weathertight, wet work in spaces is complete and dry, work above ceilings is complete, and temporary <br />HVAC system is operating and maintaining ambient temperature and humidity conditions at levels <br />intended for occupants after Project completion during the remainder of the construction period. <br />B.Lighting: Do not install wall covering until lighting that matches conditions intended for occupants after <br />Project completion is provided on the surfaces to receive wall covering. <br />C.Ventilation: Provide continuous ventilation during installation and for not less than the time <br />recommended by wall-covering manufacturer for full drying or curing. <br />PART 2 - PRODUCTS <br />2.1 VINYL WALL COVERING (WC-1) <br />A.Manufacturers: Subject to compliance with requirements, provide products by the following: <br />1.D. L. Couch. <br />2.Total Weight: 20 oz., excluding coatings. <br />3.Width: 54 inches <br />4.Backing: Osnaburg. <br />5.Colors, Textures, and Patterns: Reese – Chambord 2VRE-04. <br />2.2 ACCESSORIES <br />A.Adhesive: Mildew-resistant, nonstaining, strippable adhesive, for use with specific wall covering and <br />substrate application indicated and as recommended in writing by wall-covering manufacturer. <br />B.Primer/Sealer: Mildew resistant, complying with requirements in Section 09 9123 "Interior Painting" and <br />recommended in writing by primer/sealer and wall-covering manufacturers for intended substrate. <br />C.Metal Primer: Interior ferrous metal primer complying with Section 09 9123 "Interior Painting" and <br />recommended in writing by primer and wall-covering manufacturers for intended substrate. <br />D.Seam Tape: As recommended in writing by wall-covering manufacturer.
The URL can be used to link to this page
Your browser does not support the video tag.