Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />WALL COVERINGS 09 7200 - 4 <br />ed. 2023-10-20 <br />C.Install strips in same order as cut from roll. <br />1.For solid-color, even-texture, or random-match wall coverings, reverse every other strip. <br />D.Install wall covering without lifted or curling edges and without visible shrinkage. <br />E.Install seams vertical and plumb at least 6 inches from outside corners and 3 inches from inside corners <br />unless a change of pattern or color exists at corner. Horizontal seams are not permitted. <br />F.Trim edges and seams for color uniformity, pattern match, and tight closure. Butt seams without overlaps <br />or gaps between strips. <br />G.Fully bond wall covering to substrate. Remove air bubbles, wrinkles, blisters, and other defects. <br />3.4 CLEANING <br />A.Remove excess adhesive at seams, perimeter edges, and adjacent surfaces. <br />B.Use cleaning methods recommended in writing by wall-covering manufacturer. <br />C.Replace strips that cannot be cleaned. <br />D.Reinstall hardware and hardware accessories, electrical plates and covers, light fixture trims, and similar <br />items. <br />END OF SECTION 09 7200