Laserfiche WebLink
DN <br />DN <br />DN <br />D <br />W <br />FEC <br />FEC <br />FECFEC <br />FE <br />C <br />FE <br />- <br />K <br />FE <br />FE <br />FE <br />A <br />A B <br />B C <br />C <br />D <br />D E <br />E <br />F <br />F G <br />G <br />H <br />H <br />J <br />J <br />1 1 <br />2 2 <br />3 3 <br />5 5 <br />6 6 <br />7 7 <br />8 8 <br />9 9 <br />D.8 <br />D.8 <br />F.2 <br />F.2 <br />2.5 2.5 <br />A <br />A B <br />B C <br />C <br />D <br />D E <br />E <br />F <br />F G <br />G <br />H <br />H <br />J <br />J <br />1 1 <br />2 2 <br />2.5 2.5 <br />3 3 <br />4 4 <br />5 5 <br />6 6 <br />7 7 <br />8 8 <br />9 9 <br />D.8 <br />D.8 <br />F.2 <br />F.2 <br />102 <br />GAME <br />ROOM <br />121 <br />BOWLING <br />LANES <br />120 <br />BOWLERS <br />APPROACH <br />119 <br />BOWLERS <br />SEATING <br />122 <br />PINSETTER <br />SERVICE <br />124 <br />CORRIDOR <br />123 <br />ELECTRICAL <br />125 <br />BREAK <br />ROOM <br />126 <br />OFFICE <br />127 <br />SAFE <br />128 <br />MECHANICS <br />129 <br />EXIST. <br />ELEVATOR <br />101 <br />MALL <br />ENTRANCE <br />103 <br />STORAGE <br />103A <br />STORAGE <br />104 <br />JANITOR <br />105 <br />FAMILY <br />RESTROOM <br />109 <br />WOMENS <br />108 <br />MENS <br />116 <br />REDEMPTION <br />ROOM <br />117 <br />PARTY/ <br />GAME <br />KARAOKE <br />118 <br />BOWLING/ <br />GUEST <br />COUNTER <br />115 <br />KITCHEN <br />114 <br />COOLER <br />110 <br />MECH. <br />111 <br />COMM./STORAGE <br />131 <br />BAR <br />SEATING <br />112 <br />BAR <br />113 <br />SNACK <br />BAR <br />135 <br />PARTY <br />ROOM 1 <br />137 <br />VESTIBULE <br />138 <br />PARTY <br />ROOM 2 <br />139 <br />PARTY <br />ROOM 3 <br />136 <br />STORAGE <br />107 <br />STORAGE <br />106 <br />STORAGE <br />130 <br />SIDE <br />AISLE <br />140 <br />STORAGE <br />142 <br />GAME <br />ROOM <br />141 <br />PLUSH <br />STORAGE <br />? <br />? <br />132 <br />BILLIARDS <br />NOTE:FP CONTRACTOR SHALL PROVIDE A FULLY <br />SPRINKLERED SYSTEM PER NFPA 13. THE <br />EXISTING SYSTEM SHALL REMAIN OPERATIONAL <br />THROUGHOUT CONSTRUCTION. CONTRACTOR <br />SHALL FIELD VERIFY ALL EXISTING CONDITIONS. <br />THERE SHALL BE NO INTERFERANCE OR <br />TERMINATION OF ANY LIFE SAFETY SYSTEMS FOR <br />ANY TENANT AREAS OR MALL COMMON AREAS. <br />12/9/2024 4:00:37 PM <br />2309147GR <br />ROUND1 <br />BOWLING AND <br />AMUSEMENT <br />2800 N. MAIN ST. SUITE 1100 <br />SANTA ANA, CA 92705 <br />ROUND 1 <br />ENTERTAINMENT <br />3070 SATURN ST. STE. 200 <br />BREA, CA 92821 <br />FIRE PROTECTION <br />FLOOR PLAN <br />F-101 <br />MAINPLACE <br />MALL <br />REMODEL <br />CLIENT <br />ARCHITECTS <br />PARADIGM <br />415 Leonard Street NW, Suite 200 <br />Grand Rapids, MI 49504 <br />(616) 785-5656 <br />www.paradigmae.com <br />Grand Rapids | Phoenix | Traverse City <br />DESIGN <br />ENGINEERS| <br />DATE DESCRIPTION <br />RELEASE DATE <br />SHEET <br />PROJECT <br />PROJECT <br />P ALL STATE AND LOCAL AMENDMENTS TO ADOPTED BUILDING CODE <br />SHALL BE ADHERED TO. <br />O REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. <br />N PROVIDE A PRESSURE REDUCING VALVE WHERE THE POTENTIAL <br />EXISTS FOR WATER PRESSURES EXCEEDING 175 PSI. [NFPA 13 <br />16.9.7] <br />M THE ENTIRE SYSTEM MUST BE DRAINABLE. SPRINKLER FEED <br />PIPES MUST BE PITCHED FOR DRAINAGE (I.E., TRAPPED PIPING, <br />DRY PIPE SYSTEMS, LOW POINTS, ETC.). [NFPA 13 8.15.2.2] PROVIDE <br />AUXILIARY DRAINS FOR TRAPPED PIPING. [NFPA 13 8.15.2.5] ALL <br />DRAINS MUST DISCHARGE OUTSIDE OR TO A DRAIN CONNECTION. <br />[NFPA 13 16.10] <br />L THE ENTIRE BUILDING MUST BE SPRINKLED. IDENTIFY ALL AREAS <br />TO BE SPRINKLED. <br />K THE MAXIMUM AREA PER RISER IS: LIGHT OR ORDINARY HAZARD ¬ <br />52,000 SQ. FT.; EXTRA HAZARD ¬ 40,000 SQ. FT. PER RISER OR 25,000 <br />FOR PIPE SCHEDULE SYSTEMS. [NFPA 13 4.4] <br />J THE FIRE DEPARTMENT CONNECTION MUST BE AN APPROVED NH <br />STANDARD, INTERNAL THREADED SWIVEL FITTING, WITH LISTED <br />PLUGS OR CAPS. [NFPA 24 5.9] <br />I PROVIDE (5) FIVE EXTRA SPRINKLER HEADS OF EACH TYPE IN <br />CABINET NEAR RISER WITH A WRENCH. <br />H SHOW THAT THE SYSTEM IS SUPERVISED PER NFPA 13 16.9.3.3 AND <br />TITLE 24, PART 2, 903.4: A. PROVIDE TAMPER SWITCHES AT ALL <br />CONTROL VALVES. B. PROVIDE A FLOW SWITCH OR ALARM CHECK <br />VALVE AND SPECIFY CONNECTION TO THE GENERAL BUILDING <br />ALARM (MUST SOUND WITHIN 5 MINUTES OF FLOW). [NFPA 13 7.7] <br />G PROVIDE A LOCAL WATERFLOW ALARM. [NFPA 13 7.7] <br />F PROVIDE A SPRINKLER SYSTEM RISER SCHEMATIC WITH CONTROL <br />AND CHECK VALVES, BACKFLOW PREVENTION DEVICES, SUPPLY <br />AND SYSTEM PRESSURE GAUGES, WATER FLOW SWITCHES, <br />TAMPER SUPERVISING SWITCHES, LOCAL WATERFLOW ALARM <br />LOCATION, AND SPARE SPRINKLER HEAD CABINET LOCATION. <br />[NFPA 13 7.7, 16.9.3] <br />E ALL SPRINKLER PIPING AND HEAD PLACEMENT SHALL BE <br />COORDINATED WITH LIGHTING, DIFFUSERS, ETC. CENTER <br />SPRINKLER HEADS WITHIN CEILING TILES. <br />D IT IS THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR <br />TO ARRANGE FOR A FLOW TEST AS CLOSE TO THIS SITE AS <br />POSSIBLE. THE RESULTS OF THE FLOW TEST SHALL BE INCLUDED <br />WITH THE SUBMITTALS OF THE HYDRAULIC CALCULATIONS FOR <br />REVIEW. <br />C HYDRAULIC CALCULATIONS SHALL LEAVE A MINIMUM PRESSURE <br />CUSHION OF 10% FROM THE AVAILABLE SUPPLY PRESSURE TO THE <br />SYSTEM PRESSURE REQUIREMENT FOR EACH CALCULATION. <br />B HYDRAULIC CALCULATIONS SHALL BE RUN FOR ALL REMOTE AREAS <br />AND SUBMITTED WITH WORKING DRAWINGS WHICH SHOW <br />SPRINKLERS, PIPE, INSPECTORS TEST VALVES, AND HANGER <br />LOCATIONS, PIPE SIZING AND RISER DETAIL. <br />A BUILDING SHALL BE FULLY SPRINKLERED. ENTIRE SYSTEMS SHALL <br />BE DESIGNED IN ACCORDANCE WITH NFPA 13 LIGHT HAZARD <br />OCCUPANCY AND MANUFACTURES RECOMMENDATIONS FOR THE <br />SPRINKLERS USED. STORAGE AND MECHANICAL ROOMS SHALL BE <br />DESIGNED IN ACCORDANCE WITH NFPA ORDINARY HAZARD. <br />FIRE PROTECTION NOTES <br />SCALE:N <br />PLAN <br />3/32" = 1'-0" <br />FIRE PROTECTION FIRST FLOOR PLAN <br />SCOPE OF WORK BOUNDARY <br />10-03-24 LANDLORD REVIEW <br />12-09-24 PERMITS