My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />3.Bare Piping at Ceiling Penetrations in Finished Spaces: One piece, cast brass with <br />polished chrome-plated finish, One piece or split casting, cast brass with polished <br />chrome-plated finish, Split casting, cast brass with polished chrome-plated finish, One <br />piece, stamped steel with set-screw, One piece or split plate, stamped steel with set- <br />screw, or Split plate, stamped steel with set-screw. <br />4.Bare Piping in Unfinished Service Spaces: One piece, cast brass with polished chrome- <br />plated finish, stamped steel with set-screw, stamped steel with spring clips, or stamped <br />steel with set-screw or spring clips. <br />5.Bare Piping in Equipment Rooms: One piece, stamped steel with set-screw or spring <br />clips. <br />6.Bare Piping at Floor Penetrations in Equipment Rooms: One-piece floor plate. <br />3.7 SLEEVE INSTALLATION <br />A.General Requirements: Install sleeves for pipes and tubes passing through penetrations in <br />floors, partitions, roofs, and walls. <br />B.Sleeves are not required for core-drilled holes. <br />C.Permanent sleeves are not required for holes formed by removable PE sleeves. <br />D.Cut sleeves to length for mounting flush with both surfaces unless otherwise indicated. <br />E.Install sleeves in new partitions, slabs, and walls as they are built. <br />F.For interior wall penetrations, seal annular space between sleeve and pipe or pipe insulation <br />using joint sealants appropriate for size, depth, and location of joint. Comply with requirements <br />for joint sealants in Division 07 Section "Joint Sealants." <br />G.For exterior wall penetrations above grade, seal annular space between sleeve and pipe using <br />joint sealants appropriate for size, depth, and location of joint. Comply with requirements for <br />joint sealants in Division 07 Section "Joint Sealants." <br />H.For exterior wall penetrations below grade, seal annular space between sleeve and pipe using <br />sleeve seals. <br />I.Seal space outside of sleeves in concrete slabs and walls with grout. <br />J.Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and <br />pipe or pipe insulation unless otherwise indicated. <br />K.Install sleeve materials according to the following applications: <br />1.Sleeves for Piping Passing through Gypsum-Board Partitions: <br />a.PVC-pipe or Galvanized-steel-pipe sleeves for pipes smaller than NPS 6. <br />b.Exception: Sleeves are not required for water-supply tubes and waste pipes for <br />individual plumbing fixtures if escutcheons will cover openings.
The URL can be used to link to this page
Your browser does not support the video tag.