My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />PLUMBING DEMOLITION FOR REMODELING 22 0501 - 1 <br />SECTION 22 0501 – PLUMBING DEMOLITION FOR REMODELING <br />PART 1 - GENERAL <br />1.1 SECTION INCLUDES <br />A.Interior demolition, removal and abandonment of interior plumbing systems, including sanitary <br />sewer/vent systems, storm systems, domestic hot and cold water systems, water heaters, plumbing <br />fixtures, equipment, etc. <br />B.Cleaning and repair of existing equipment to remain. <br />PART 2 - PRODUCTS <br />2.1 MATERIALS AND EQUIPMENT <br />A.Materials and equipment for patching work: As specified individual sections. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A.Verify field measurements and plumbing systems are as shown on drawings. <br />B.Verify that piping systems and equipment serve only areas shown on drawings. <br />C.Demolition drawings are based on casual field observation and existing record drawings. <br />Contractor to field verify exact conditions that exist. Report discrepancies to Architect/Engineer <br />before distributing existing installation. <br />D.Beginning of demolition means installer accepts existing conditions. <br />3.2 PREPARATION <br />A.Disconnect piping systems in walls, floors and ceilings scheduled for removal. <br />B.Provide temporary connections to maintain existing systems in service during construction. <br />3.3 DEMOLITION EXISTING PLUMBING WORK <br />A.Remove existing installations to accommodate requirements for new construction. <br />B.Remove abandoned piping and equipment. <br />C.Cut piping flush with walls and floors, and patch surfaces. <br />D.Repair adjacent construction and finishes damaged during demolition work.
The URL can be used to link to this page
Your browser does not support the video tag.