My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />B.Examine roughing-in of reinforcement and cast-in-place anchors to verify actual locations <br />before installation. <br />C.Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 APPLICATIONS <br />A.Multiple Pipe Supports: Secure pipes to trapeze member with clamps approved for application <br />by an agency acceptable to authorities having jurisdiction. <br />B.Hanger-Rod Stiffeners: Install hanger-rod stiffeners where indicated or scheduled on Drawings <br />to receive them and where required to prevent buckling of hanger rods due to seismic forces. <br />C.Strength of Support and Seismic-Restraint Assemblies: Where not indicated, select sizes of <br />components so strength is adequate to carry present and future static and seismic loads within <br />specified loading limits. <br />3.3 VIBRATION CONTROL AND SEISMIC-RESTRAINT DEVICE INSTALLATION <br />A.Coordinate the location of embedded connection hardware with supported equipment <br />attachment and mounting points and with requirements for concrete reinforcement and <br />formwork. <br />B.Installation of vibration isolators must not cause any change of position of equipment, piping, or <br />ductwork resulting in stresses or misalignment. <br />C.Comply with requirements in Section 077200 "Roof Accessories" for installation of roof curbs, <br />equipment supports, and roof penetrations. <br />D.Equipment Restraints: <br />1.Install seismic snubbers on HVAC equipment mounted on vibration isolators. Locate <br />snubbers as close as possible to vibration isolators and bolt to equipment base and <br />supporting structure. <br />2.Install resilient bolt isolation washers on equipment anchor bolts where clearance <br />between anchor and adjacent surface exceeds 0.125 inch. <br />3.Install seismic-restraint devices using methods approved by an agency acceptable to <br />authorities having jurisdiction that provides required submittals for component. <br />E.Piping Restraints: <br />1.Comply with requirements in MSS SP-127. <br />2.Space lateral supports a maximum of 40 feet o.c., and longitudinal supports a maximum <br />of 80 feet o.c. <br />3.Brace a change of direction longer than 12 feet. <br />F.Install cables so they do not bend across edges of adjacent equipment or building structure.
The URL can be used to link to this page
Your browser does not support the video tag.