Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />3.6 AIR-SPRING ISOLATOR INSTALLATION <br />A.Independent Isolator Installation: <br />1.Install tank valve into each air isolator. <br />3.7 VIBRATION ISOLATION EQUIPMENT BASES INSTALLATION <br />A.Coordinate the location of embedded connection hardware with supported equipment <br />attachment and mounting points and with requirements for concrete reinforcement and <br />formwork. <br />END OF SECTION 23 0548