Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />SECTION 23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A.Section Includes: <br />1.Balancing Air Systems: <br />a.Variable-air-volume systems. <br />b.Constant volume systems. <br />2.Balancing Hydronic Piping Systems: <br />a.Variable-flow hydronic systems. <br />b.Primary-secondary hydronic systems. <br />c.Constant flow hydronic systems <br />1.3 DEFINITIONS <br />A.AABC: Associated Air Balance Council. <br />B.NEBB: National Environmental Balancing Bureau. <br />C.TAB: Testing, adjusting, and balancing. <br />D.TABB: Testing, Adjusting, and Balancing Bureau. <br />E.TAB Specialist: An entity engaged to perform TAB Work. <br />1.4 SUBMITTALS <br />A.Qualification Data: Within 30 days of Contractor's Notice to Proceed, submit documentation <br />that the TAB contractor and this Project's TAB team members meet the qualifications specified <br />in "Quality Assurance" Article. <br />B.Strategies and Procedures Plan: Within 30 days of Contractor's Notice to Proceed, submit TAB <br />strategies and step-by-step procedures as specified in "Preparation" Article. <br />C.Certified TAB reports. <br />D.Sample report forms.