My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />SECTION 23 0593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A.Section Includes: <br />1.Balancing Air Systems: <br />a.Variable-air-volume systems. <br />b.Constant volume systems. <br />2.Balancing Hydronic Piping Systems: <br />a.Variable-flow hydronic systems. <br />b.Primary-secondary hydronic systems. <br />c.Constant flow hydronic systems <br />1.3 DEFINITIONS <br />A.AABC: Associated Air Balance Council. <br />B.NEBB: National Environmental Balancing Bureau. <br />C.TAB: Testing, adjusting, and balancing. <br />D.TABB: Testing, Adjusting, and Balancing Bureau. <br />E.TAB Specialist: An entity engaged to perform TAB Work. <br />1.4 SUBMITTALS <br />A.Qualification Data: Within 30 days of Contractor's Notice to Proceed, submit documentation <br />that the TAB contractor and this Project's TAB team members meet the qualifications specified <br />in "Quality Assurance" Article. <br />B.Strategies and Procedures Plan: Within 30 days of Contractor's Notice to Proceed, submit TAB <br />strategies and step-by-step procedures as specified in "Preparation" Article. <br />C.Certified TAB reports. <br />D.Sample report forms.
The URL can be used to link to this page
Your browser does not support the video tag.