Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />HVAC INSULATION 23 0700 - 2 <br />3.Detail application of field-applied jackets. <br />4.Detail application at linkages of control devices. <br />5.Detail field application for each equipment type. <br />C.Qualification Data: For qualified Installer. <br />D.Material Test Reports: From a qualified testing agency acceptable to authorities having <br />jurisdiction indicating, interpreting, and certifying test results for compliance of insulation <br />materials, sealers, attachments, cements, and jackets, with requirements indicated. Include <br />dates of tests and test methods employed. <br />E.Field quality-control reports. <br />1.4 QUALITY ASSURANCE <br />A.Installer Qualifications: Skilled mechanics who have successfully completed an apprenticeship <br />program or another craft training program certified by the Department of Labor, Bureau of <br />Apprenticeship and Training. <br />B.Fire-Test-Response Characteristics: Insulation and related materials shall have fire-test- <br />response characteristics indicated, as determined by testing identical products per ASTM E 84, <br />by a testing and inspecting agency acceptable to authorities having jurisdiction. Factory label <br />insulation and jacket materials and adhesive, mastic, tapes, and cement material containers, with <br />appropriate markings of applicable testing and inspecting agency. <br />1.Insulation Installed Indoors: Flame-spread index of 25 or less, and smoke-developed <br />index of 50 or less. <br />2.Insulation Installed Outdoors: Flame-spread index of 75 or less, and smoke-developed <br />index of 150 or less. <br />1.5 DELIVERY, STORAGE, AND HANDLING <br />A.Packaging: Insulation material containers shall be marked by manufacturer with appropriate <br />ASTM standard designation, type and grade, and maximum use temperature. <br />1.6 COORDINATION <br />A.Coordinate size and location of supports, hangers, and insulation shields specified in <br />Division 23 Section "Hangers and Supports for HVAC Piping and Equipment." <br />B.Coordinate clearance requirements with piping Installer for piping insulation application, duct <br />Installer for duct insulation application, and equipment Installer for equipment insulation <br />application. Before preparing piping and ductwork Shop Drawings, establish and maintain <br />clearance requirements for installation of insulation and field-applied jackets and finishes and <br />for space required for maintenance.