My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />SUBSTITUTION REQUEST FORM 01 2500.10 - 2 <br />ed. 2023-09-22 <br />SUBSTITUTION REQUEST FORM <br />The Undersigned certifies: <br />•Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product. <br />•Same warranty will be furnished for proposed substitution as for specified product. <br />•Same maintenance service and source of replacement parts, as applicable, is available. <br />•Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule. <br />•Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become <br />apparent are to be waived. <br />•Proposed substitution does not affect dimensions and functional clearances. <br />•Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution. <br />•Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects. <br />Submitted by: <br />Signed by: <br />Firm: <br />Address: <br />Telephone: <br />Attachments: <br />A/E’s REVIEW AND ACTION <br /> Substitution approved - Make submittals in accordance with Specification Section 01 2500 Substitution Procedures. <br /> Substitution approved as noted - Make submittals in accordance with Specification Section 01 2500 Substitution Procedures. <br /> Substitution rejected - Use specified materials. <br /> Substitution Request received too late - Use specified materials. <br />Signed by:Date: <br />Additional Comments: Contractor Subcontractor Supplier Manufacturer A/E <br /> Other:
The URL can be used to link to this page
Your browser does not support the video tag.