Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />CONTRACT MODIFICATION PROCEDURES 01 2600 - 2 <br />ed. 2023-09-22 <br />a. Include a list of quantities of products required or eliminated and unit costs, with <br />total amount of purchases and credits to be made. If requested, furnish survey data <br />to substantiate quantities. <br />b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br />discounts. <br />c. Include costs of labor and supervision directly attributable to the change. <br />d. Include an updated Contractor's construction schedule that indicates the effect of <br />the change, including, but not limited to, changes in activity duration, start and <br />finish times, and activity relationship. Use available total float before requesting an <br />extension of the Contract Time. <br />e. Quotation Form: Use forms acceptable to Architect. <br />B. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the <br />Contract, Contractor may initiate a claim by submitting a request for a change to Architect. <br />1. Include a statement outlining reasons for the change and the effect of the change on the <br />Work. Provide a complete description of the proposed change. Indicate the effect of the <br />proposed change on the Contract Sum and the Contract Time. <br />2. Include a list of quantities of products required or eliminated and unit costs, with total <br />amount of purchases and credits to be made. If requested, furnish survey data to <br />substantiate quantities. <br />3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br />discounts. <br />4. Include costs of labor and supervision directly attributable to the change. <br />5. Include an updated Contractor's construction schedule that indicates the effect of the <br />change, including, but not limited to, changes in activity duration, start and finish times, <br />and activity relationship. Use available total float before requesting an extension of the <br />Contract Time. <br />6. Comply with requirements in Section 01 2500 "Substitution Procedures" if the proposed <br />change requires substitution of one product or system for product or system specified. <br />7. Proposal Request Form: Use form acceptable to Architect. <br />1.5 ADMINISTRATIVE CHANGE ORDERS <br />A. Allowance Adjustment: See Section 01 2100 "Allowances" for administrative procedures for <br />preparation of Change Order Proposal for adjusting the Contract Sum to reflect actual costs of <br />allowances. <br />1.6 CHANGE ORDER PROCEDURES <br />A. On Owner's approval of a Work Change Proposal Request, Architect will issue a Change Order <br />for signatures of Owner and Contractor on AIA Document G701.