Laserfiche WebLink
INSULATION WHERE OCCURS. SEE PARTITION <br />SCHEDULE ON CONSTRUCTION PLAN <br />PARTITION BOTTOM TRACK <br />1 <br />2" <br />FLOOR FINISH AS SCHEDULED <br />NOTE: <br />1.PROVIDE ACOUSTICAL SEALANT (OR FIRE CAULKING AT FIRE-RESISTANCE RATED WALLS) AT BOTH SIDES OF <br />WALL BOTTOM. <br />2.REFERENCE UL #BW-S-0001 FOR FIRE RESISTANCE RATED WALL ASSEMBLIES. <br />3.ALL JOINTS OR PENETRATIONS IN FIRE-RESISTANCE RATED WALLS ARE REQUIRED TO BE PROTECTED WITH A <br />UL LISTED FIRE STOP SYSTEM. <br />PARTITION- REFER TO PARTITION <br />SCHEDULE ON CONSTRUCTION PLAN <br />CONT. METAL BOTTOM TRACK TO MATCH <br />STUD GAUGE W/ 'HILTI' SHOT PIN AT 16" O/C. <br />ICC #ESR-2269 <br />PARTITON TOP TRACK <br />20 GA. TOP TRACK, ANCHORED TO <br />DIAGONAL BRACING WITH (2) #8 1-1/4" <br />SCREWS, MIN. (ESR-3016) DO NOT MOUNT <br />TO CEILING GRID OR TILE. <br />WALL TYPE AS SCHEDULED <br />BRACE TO STRUCTURE, ALTERNATE SIDES. <br />USE METAL STUDS AT 8'-0" O.C. MAX. <br />MATCH WALL STUD SIZE & GAUGE (3-5/8" <br />20 GA. MIN). PROVIDE BENT LEG & <br />FASTEN TO TOP TRACK WITH 5/32" DIA. <br />SHOTS PINS (ESR-1663). MAX. LENGTH OF <br />BRACE 25'-0". <br />4 <br />- <br />#8 SMS 1-5/8" EACH SIDE AT EACH STUD. <br />METAL STUD WALL BRACE <br />W/ (2) #8 WOOD <br />SCREWS W/ 1 1/2" MIN. <br />PENETRATION INTO <br />PURLIN <br />EXISTING <br />STRUCTURE W/ 2X <br />RAFTERS <br />WALL BRACE DETAIL <br />4" <br /> <br />M <br />I <br />N <br />. <br />EXISTING 2X RAFTERS <br />EXISTING PURLIN <br />DOOR JAMB DETAIL <br />4" <br />MIN.DOOR PER SCHEDULE <br />DOUBLE STUDS AT STRIKE JAMB <br />PARTITION PER CONSTRUCTION <br />PLAN. <br />FACE OF WALL, WHERE OCCURS. <br />DOOR FRAME PER SCHEDULE <br />DOOR HEAD DETAIL <br />1"1" <br />CE <br />I <br />L <br />I <br />N <br />G <br /> <br />H <br />E <br />I <br />G <br />H <br />T <br />SE <br />E <br /> <br />R <br />C <br />P <br />INSULATION WHERE OCCURS. <br />DOUBLE STUD <br />5/8" TYPE 'X' GYPSUM BOARD EACH <br />SIDE OVER METAL STUD. SEE STUD <br />TABLE FOR SIZE AND SPACING. <br />DOOR FRAME PER SCHEDULE <br />DOOR PER SCHEDULE <br />HEADER AT SIDELIGHT <br />SCHEDULED WINDOW FRAME, MATCH <br />EXISTING. SEE A-7 FOR MORE <br />INFORMATION. <br />SCHEDULED GLAZING. SEE A-7 FOR <br />MORE INFORMATION. <br />DOUBLE BACK-TO-BACK METAL STUDS. <br />1" <br />SCHEDULED GLAZING. <br />SEE A-7 FOR MORE <br />INFORMATION. <br />WALL PER ARCH PLAN & <br />WALL TYPES <br />1" <br />BOXED JAMB ON EITHER <br />SIDE OF OPENING <br />SCHEDULED WINDOW <br />FRAME, MATCH EXISTING. <br />SEE A-7 FOR MORE <br />INFORMATION. <br />DOOR PER SCHEDULE <br />DOOR JAMB AT SIDELIGHT <br />GLAZING AT SILL <br />SCHEDULED WINDOW FRAME, MATCH <br />EXISTING. SEE A-7 FOR MORE <br />INFORMATION. <br />FINISH FLOOR'G PER PLAN(E) SLAB <br />SCHEDULED GLAZING. SEE A-7 FOR MORE <br />INFORMATION. <br />BOTTOM TRACK W/ SHOT PINS AT 24" <br />O.C. AND 2" FROM EACH END. <br />(ERS-2269). MIN. 1" EMBEDMENT. <br />CEILING AS SCHEDULED- REFER TO RCP <br />9' <br />- <br />0 <br />" <br />CE <br />I <br />L <br />I <br />N <br />G <br /> <br />H <br />E <br />I <br />G <br />H <br />T <br /> <br />( <br />V <br />. <br />I <br />. <br />F <br />. <br />) <br />PARTITION- REFER TO PARTITION SCHEDULE <br />ON CONSTRUCTION PLAN <br />TOP OF SLAB OR FLOOR LEVEL <br />REFER TO SPECIFIED DETAIL FOR BRACE <br />FRAMING <br />CEILING HEIGHT PARTITION <br />3 <br />- <br />4 <br />- <br />±1 <br />3 <br />- <br />0 <br />" <br />TO <br /> <br />S <br />T <br />R <br />U <br />C <br />T <br />U <br />R <br />E <br /> <br />A <br />B <br />O <br />V <br />E <br /> <br />( <br />V <br />. <br />I <br />. <br />F <br />. <br />) <br />NOTE: <br />1.PARTITION BRACING SHALL NOT BE ATTACHED TO CEILING GRID. GENERAL CONTRACTOR TO VERIFY EXISTING STUD <br />SIZE AND MATCH WHERE NEW PARTITION ABUTS EXISTING. <br />45° <br />UNDERSIDE OF STRUCTURE ABOVE <br />2 <br />- <br />SOUND BATT INSULATION IN CAVITY - <br />REFER TO PARTITION SCHEDULE <br />(ICC ESR-3064P)BACKING DETAILSSMA- METAL STUD TABLE <br />'S'- SECTION HT. FOR GYP BOARD WALL <br />250S125-18 <br />Fy <br />(ksi)(5 PSF L/240) <br />SPACING <br />(in) O.C. <br />362S125-30 <br />250S125-30 <br />362S125-18 <br />600S125-18 <br />600S125-30 <br />MEMBER DEPTH: <br />(EXAMPLE: 6" - 600 X 1 100 INCHES) ALL MEMBER DEPTHS ARE <br />TAKEN IN 1 100 INCHES FOR ALL "T" SECTIONS MEMBER DEPTH <br />IS THE INSIDE DIMENSION <br />FLANGE WIDTH: <br />(EXAMPLE: 1 5 8" - 1.625"-162 X 1 100 INCHES) ALL <br />FLANGE WIDTHS ARE TAKEN IN 1 100 INCHES. <br />STYLE: <br />(EXAMPLE: STUD OR JOIST SECTION - S) THE FOUR ALPHA <br />CHARACTERS UTILIZED BY THE DESIGNATOR SYSTEM ARE: <br />MATERIAL THICKNESS: <br />(EXAMPLE: 0.054 IN. = 54 MILS: 1 MIL = 1 1000 IN.) <br />MATERIAL THICKNESS IS THE MINIMUM BASE <br />METAL THICKNESS IN MILS. MINIMUM BASE <br />METAL THICKNESS REPRESENTS 95% OF THE <br />DESIGN THICKNESSS= STUD OR JOIST. T = TRACK, U = CHANNEL. <br />F = FURRING <br />600 S 162 54 <br />(INTERIOR NON-BEARING WALL PER SSMA ESR-3064P <br />2 1/2" X 25 GA <br />3 5/8" X 20 GA <br />2 1/2" X 20 GA <br />3 5/8" X 25 GA <br />6" X 25 GA <br />6" X 20 GA 33 <br />33 <br />33 <br />33 <br />33 <br />33 <br />33 <br />33 <br />12 <br />16 <br />24 <br />12 <br />16 <br />24 <br />12 <br />16 <br />24 <br />12 <br />16 <br />24 <br />12 <br />16 <br />24 <br />12 <br />16 <br />24 <br />12 <br />16 <br />24 <br />12 <br />16 <br />14'-2" <br />12'-10" <br />11'-3" <br />15'-10" <br />14'-5" <br />12'-7" <br />16'-8" <br />15'-2" <br />13'-2" <br />18'-3" <br />16'-7" <br />14'-6" <br />17'-6" <br />15'-11" <br />13'-8" <br />19'-5" <br />17'-8" <br />15'-5" <br />22'-9" <br />20'-1" <br />16'-4" <br />27'-1" <br />24-7" <br />21'-6" <br />400S125-184" X 25 GA <br />400S125-334" X 20 GA <br />24 <br />600S125-336" X 20 GA 33 <br />12 <br />16 <br />28'-1" <br />25'-6" <br />22'-324 <br />OR BB24 (24" O.C.)- VERIFY <br />BB12 (12" O.C.) BB16 (16" O.C.) <br />'CLARK DIETRICH' BACKER BAR <br />MTL. STUDS- PER PARTITION SCHEDULE <br />SPACING IN FIELD <br />CONCRETE TO CARPET FLOOR TRANSITION <br />VINYL TRANSITION STRIP <br />JOHNSONITE, # CTA-XX-A <br />COLOR: T.B.D <br />SEALED CONCRETE FLOOR <br />CARPET AS SCHEDULED <br />VCT TO CONCRETE FLOOR TRANSITION <br />VINYL TRANSITION STRIP <br />JOHNSONITE, # SSR-86-B <br />COLOR: T.B.D <br />SEALED CONCRETE FLOOR <br />VCT FLOORING AS SCHEDULED <br />2 <br />1 <br />1/ <br />2 <br />" <br />MA <br />X <br />. <br />D-11 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />13 <br />DE <br />T <br />A <br />I <br />L <br />S <br />TE <br />N <br />A <br />N <br />T <br /> <br />I <br />M <br />P <br />R <br />O <br />V <br />E <br />M <br />E <br />N <br />T <br />SH <br />E <br />E <br />T <br /> <br />T <br />I <br />T <br />L <br />E <br />: <br />JO <br />B <br /> <br />T <br />I <br />T <br />L <br />E <br />: <br />HA <br />R <br />B <br />O <br />R <br /> <br />W <br />A <br />R <br />N <br />E <br />R <br /> <br />B <br />U <br />S <br />I <br />N <br />E <br />S <br />S <br /> <br />P <br />A <br />R <br />K <br />27 <br />2 <br />0 <br /> <br />S <br /> <br />H <br />A <br />R <br />B <br />O <br />R <br /> <br />B <br />L <br />V <br />D <br />, <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />E <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />ISSUE / REVISIONS <br />24-237.05 <br />12 <br />2025